Solar project JEA-Q004-PV, Duval County

Solar project JEA-Q004-PV, Duval County is a 50.0 MW solar request suspended in the Southeast interconnection queue, in Duval County, Florida, connecting to Jacksonville Electric Authority.

Queue statusPaused / redesign
  1. PlanningQueued Dec 2017 (current stage)
  2. Consented (not yet reached)
  3. Construction (not yet reached)
  4. OperatingTarget Dec 2050 (not yet reached)
  5. Closed (not yet reached)

Studies assess what grid upgrades the project would need and who pays for them. A signed interconnection agreement is the main step before construction.

Request details

Queue ID
JEA-Q004-PV
Grid region
Southeast (non-ISO utilities)
Utility / transmission owner
Jacksonville Electric Authority
Connection point (POI)
Brandy Branch Sub
Location
Duval County, Florida
Technology
Solar: 50.0 MW
Total requested
50.0 MW
Service type
Network resource (NRIS)
Study phase
In Progress (unknown study)
Queue status
Suspended
Entered queue
21 December 2017
Proposed online date
December 2050

Location

Marker shows the centre of Duval County; the queue data does not give exact sites.