United States › Grid › Interconnection queues › Florida
SOLAR · SOUTHEASTSolar project JEA-Q006-PV, Duval County
Solar project JEA-Q006-PV, Duval County is a 50.0 MW solar request suspended in the Southeast interconnection queue, in Duval County, Florida, connecting to Jacksonville Electric Authority.
Queue statusPaused / redesign
- PlanningQueued Dec 2017 (current stage)
- Consented (not yet reached)
- Construction (not yet reached)
- OperatingTarget Dec 2050 (not yet reached)
- Closed (not yet reached)
Studies assess what grid upgrades the project would need and who pays for them. A signed interconnection agreement is the main step before construction.
Request details
- Queue ID
- JEA-Q006-PV
- Grid region
- Southeast (non-ISO utilities)
- Utility / transmission owner
- Jacksonville Electric Authority
- Connection point (POI)
- Westlake Sub
- Location
- Duval County, Florida
- Technology
- Solar: 50.0 MW
- Total requested
- 50.0 MW
- Service type
- Network resource (NRIS)
- Study phase
- In Progress (unknown study)
- Queue status
- Suspended
- Entered queue
- 21 December 2017
- Proposed online date
- December 2050
Location
Marker shows the centre of Duval County; the queue data does not give exact sites.
Other requests in Duval County
- Solar project JEA-Q007-PV, Duval CountySolar · 50.0 MW · agreement signed
- Gas project JEA-Q008, Duval CountyGas · 645 MW · in study
- Solar + storage project JEA-Q012, Duval CountySolar + storage · 74.9 MW · in study
- Solar + storage project JEA-Q010, Duval CountySolar + storage · 74.9 MW · in study
- Solar + storage project JEA-Q009, Duval CountySolar + storage · 74.9 MW · in study
- Solar + storage project JEA-Q011, Duval CountySolar + storage · 74.9 MW · in study
- Solar project JEA-Q005-PV, Duval CountySolar · 50.0 MW · suspended
- Solar project JEA-Q004-PV, Duval CountySolar · 50.0 MW · suspended
- Solar project JEA-Q003-PV, Duval CountySolar · 50.0 MW · suspended
- Gas project JEA-Q002, Duval CountyGas · 84.4 MW · built
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem