Solar project 336, Gilchrist County

Solar project 336, Gilchrist County is a 61.2 MW solar request suspended in the Southeast interconnection queue, in Gilchrist County, Florida, connecting to Duke Energy Florida.

Queue statusPaused / redesign
  1. PlanningQueued Sep 2023 (current stage)
  2. Consented (not yet reached)
  3. Construction (not yet reached)
  4. OperatingTarget Jun 2028 (not yet reached)
  5. Closed (not yet reached)

Studies assess what grid upgrades the project would need and who pays for them. A signed interconnection agreement is the main step before construction.

Request details

Queue ID
336
Grid region
Southeast (non-ISO utilities)
Utility / transmission owner
Duke Energy Florida
Developer
Seminole Electric Cooperative, Inc
Connection point (POI)
Bell Tap
Location
Gilchrist County, Florida
Technology
Solar: 61.2 MW
Total requested
61.2 MW
Service type
Network resource (NRIS)
Queue status
Suspended
Entered queue
15 September 2023
Proposed online date
June 2028

Location

Marker shows the centre of Gilchrist County; the queue data does not give exact sites.

Power plants in Florida · Transmission lines in Florida

Other requests in Gilchrist County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem