United States › Grid › Interconnection queues › Florida
SOLAR · SOUTHEASTSolar project 174, Gilchrist County
Solar project 174, Gilchrist County is a 74.5 MW solar request built and operating in the Southeast interconnection queue, in Gilchrist County, Florida, connecting to Duke Energy Florida.
Request details
- Queue ID
- 174
- Grid region
- Southeast (non-ISO utilities)
- Utility / transmission owner
- Duke Energy Florida
- Developer
- Florida Renewable Partners, LLC
- Connection point (POI)
- Newberry Substation
- Location
- Gilchrist County, Florida
- Technology
- Solar: 74.5 MW
- Total requested
- 74.5 MW
- Service type
- NRIS and ERIS
- Study phase
- IA Executed
- Queue status
- Operational
- Entered queue
- 21 December 2016
- Proposed online date
- November 2024
- Came online
- April 2024
Location
Marker shows the centre of Gilchrist County; the queue data does not give exact sites.
Other requests in Gilchrist County
- Solar project 171, Gilchrist CountySolar · 74.5 MW · in study
- Solar project 286, Gilchrist CountySolar · 74.5 MW · in study
- Solar project 283, Gilchrist CountySolar · 74.5 MW · suspended
- Solar project 324, Gilchrist CountySolar · 74.5 MW · suspended
- Solar project 336, Gilchrist CountySolar · 61.2 MW · suspended
- Solar project 160, Gilchrist CountySolar · 74.9 MW · built
- Solar project 295, Gilchrist CountySolar · 74.9 MW · built
- Solar project 154, Gilchrist CountySolar · 74.5 MW · built
- Gas project 90, Gilchrist CountyGas · 868 MW · withdrawn
- Gas project 88, Gilchrist CountyGas · 546 MW · withdrawn
- Solar project 262, Gilchrist CountySolar · 74.9 MW · withdrawn
- Solar project 218C, Gilchrist CountySolar · 74.9 MW · withdrawn
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem