United States › Grid › Interconnection queues › Florida
SOLAR · SOUTHEASTSolar project 324, Gilchrist County
Solar project 324, Gilchrist County is a 74.5 MW solar request suspended in the Southeast interconnection queue, in Gilchrist County, Florida, connecting to Duke Energy Florida.
Queue statusPaused / redesign
- PlanningQueued Feb 2023 (current stage)
- Consented (not yet reached)
- Construction (not yet reached)
- OperatingTarget Dec 2027 (not yet reached)
- Closed (not yet reached)
Studies assess what grid upgrades the project would need and who pays for them. A signed interconnection agreement is the main step before construction.
Request details
- Queue ID
- 324
- Grid region
- Southeast (non-ISO utilities)
- Utility / transmission owner
- Duke Energy Florida
- Developer
- Florida Renewable Partners, LLC
- Connection point (POI)
- Hayfield Substation
- Location
- Gilchrist County, Florida
- Technology
- Solar: 74.5 MW
- Total requested
- 74.5 MW
- Service type
- NRIS and ERIS
- Queue status
- Suspended
- Entered queue
- 20 February 2023
- Proposed online date
- December 2027
Location
Marker shows the centre of Gilchrist County; the queue data does not give exact sites.
Other requests in Gilchrist County
- Solar project 171, Gilchrist CountySolar · 74.5 MW · in study
- Solar project 286, Gilchrist CountySolar · 74.5 MW · in study
- Solar project 283, Gilchrist CountySolar · 74.5 MW · suspended
- Solar project 336, Gilchrist CountySolar · 61.2 MW · suspended
- Solar project 160, Gilchrist CountySolar · 74.9 MW · built
- Solar project 295, Gilchrist CountySolar · 74.9 MW · built
- Solar project 174, Gilchrist CountySolar · 74.5 MW · built
- Solar project 154, Gilchrist CountySolar · 74.5 MW · built
- Gas project 90, Gilchrist CountyGas · 868 MW · withdrawn
- Gas project 88, Gilchrist CountyGas · 546 MW · withdrawn
- Solar project 262, Gilchrist CountySolar · 74.9 MW · withdrawn
- Solar project 218C, Gilchrist CountySolar · 74.9 MW · withdrawn
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem