United States › Grid › Interconnection queues › Florida
GAS · SOUTHEASTGas project FC100379, Orange County
Gas project FC100379, Orange County is a 12.0 MW gas request in interconnection study in the Southeast interconnection queue, in Orange County, Florida, connecting to Duke Energy Florida.
Queue statusIn planning
- PlanningQueued Nov 2025 (current stage)
- Consented (not yet reached)
- Construction (not yet reached)
- OperatingTarget Jun 2026 (not yet reached)
- Closed (not yet reached)
Studies assess what grid upgrades the project would need and who pays for them. A signed interconnection agreement is the main step before construction.
Request details
- Queue ID
- FC100379
- Grid region
- Southeast (non-ISO utilities)
- Utility / transmission owner
- Duke Energy Florida
- Developer
- Masked
- Connection point (POI)
- Parkway 69 kV Substation
- Location
- Orange County, Florida
- Technology
- Gas: 12.0 MW
- Total requested
- 12.0 MW
- Service type
- Network resource (NRIS)
- Study phase
- In Progress (unknown study)
- Queue status
- Active
- Entered queue
- 25 November 2025
- Proposed online date
- June 2026
Location
Marker shows the centre of Orange County; the queue data does not give exact sites.
Other requests in Orange County
- Solar project 343, Orange CountySolar · 74.9 MW · under construction
- Solar project 342, Orange CountySolar · 74.9 MW · under construction
- Solar project 341, Orange CountySolar · 74.9 MW · under construction
- Taylor Creek TwoSolar · 60.0 MW · in study
- Stanton AGas · 74.7 MW · built
- Orange county Taylor CreekSolar · 74.5 MW · built
- Stanton 1Coal · 30.0 MW · built
- Other project 107, Orange CountyOther · 36.0 MW · withdrawn
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem