United States βΊ Grid βΊ Interconnection queues βΊ Florida
OTHER Β· SOUTHEASTOther project 107, Orange County
Other project 107, Orange County is a 36.0 MW other request withdrawn in the Southeast interconnection queue, in Orange County, Florida, connecting to Duke Energy Florida.
Queue statusWithdrawn / abandoned
- PlanningQueued Feb 2011 (completed)
- Withdrawn / abandoned (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- 107
- Grid region
- Southeast (non-ISO utilities)
- Utility / transmission owner
- Duke Energy Florida
- Developer
- Masked
- Location
- Orange County, Florida
- Technology
- Other: 36.0 MW
- Total requested
- 36.0 MW
- Queue status
- Withdrawn
- Entered queue
- 15 February 2011
Location
Marker shows the centre of Orange County; the queue data does not give exact sites.
Other requests in Orange County
- Solar project 343, Orange CountySolar Β· 74.9 MW Β· under construction
- Solar project 342, Orange CountySolar Β· 74.9 MW Β· under construction
- Solar project 341, Orange CountySolar Β· 74.9 MW Β· under construction
- Taylor Creek TwoSolar Β· 60.0 MW Β· in study
- Gas project FC100379, Orange CountyGas Β· 12.0 MW Β· in study
- Stanton AGas Β· 74.7 MW Β· built
- Orange county Taylor CreekSolar Β· 74.5 MW Β· built
- Stanton 1Coal Β· 30.0 MW Β· built
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem