πŸ”Œ EV Partnership Switch to Octopus Energy & unlock exclusive smart EV charging rates Find out more β†’ Skip to main content

United States β€Ί Grid β€Ί Interconnection queues β€Ί Florida

OTHER Β· SOUTHEAST

Other project 107, Orange County

Other project 107, Orange County is a 36.0 MW other request withdrawn in the Southeast interconnection queue, in Orange County, Florida, connecting to Duke Energy Florida.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Feb 2011 (completed)
  2. Withdrawn / abandoned (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
107
Grid region
Southeast (non-ISO utilities)
Utility / transmission owner
Duke Energy Florida
Developer
Masked
Location
Orange County, Florida
Technology
Other: 36.0 MW
Total requested
36.0 MW
Queue status
Withdrawn
Entered queue
15 February 2011

Location

Marker shows the centre of Orange County; the queue data does not give exact sites.

Power plants in Florida Β· Transmission lines in Florida

Other requests in Orange County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem