United States β€Ί Grid β€Ί Interconnection queues β€Ί Florida

GAS Β· SOUTHEAST

Stanton A

Stanton A is a 74.7 MW gas request built and operating in the Southeast interconnection queue, in Orange County, Florida, connecting to Orlando Utilities Commission.

Queue statusOperating
  1. PlanningQueued May 2019 (completed)
  2. Consented (completed)
  3. Construction (completed)
  4. OperatingJan 2018 (current stage)
  5. Closed (not yet reached)

Request details

Queue ID
201901
Grid region
Southeast (non-ISO utilities)
Utility / transmission owner
Orlando Utilities Commission
Connection point (POI)
Stanton 230 kV Yard
Location
Orange County, Florida
Technology
Gas: 74.7 MW
Total requested
74.7 MW
Service type
Network resource (NRIS)
Study phase
IA Executed
Queue status
Operational
Entered queue
30 May 2019
Proposed online date
January 2018
Came online
January 2018

Location

Marker shows the centre of Orange County; the queue data does not give exact sites.

Power plants in Florida Β· Transmission lines in Florida

Other requests in Orange County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem