🔌 EV Partnership Switch to Octopus Energy & unlock exclusive smart EV charging rates Find out more → Skip to main content

United States › Grid › Interconnection queues

OCTARY USA · INTERCONNECTION QUEUES

Completed queue projects in the USA — page 43

Before a new power plant or battery can connect to the US grid, it joins a queue for studies and an interconnection agreement. Most requests never get built. This shows every request: active, built and withdrawn.

Requests shown4,787563.7 GW
Active in queue2,001.0 GW9,187 requests
Agreement signed423.2 GW2,141 requests
Withdrawn24,2054,519.8 GW never built

Map

Loading requests…
In studyAgreement signedUnder constructionBuiltSuspendedWithdrawn

Requests

4,787 requests · page 43 of 96
ProjectCapacityStatusLocationRegionQueuedOnline
Goat Wind
Onshore wind · Goat Wind, LP
70.0 MWOperating ERCOT Jan 2006target 2008
Battery storage project J226, Mason County
Battery storage
70.0 MWOperating Mason, MIMISO Sep 20112013
Geothermal project Company IE, Lander County
Geothermal
70.0 MWOperating Lander, NVWest Mar 2018target 2020
Boundary Powerhouse
Hydro
70.0 MWOperating Pend Oreille, WAWest Feb 2015target 2016
Waymart WF
Onshore wind
70.0 MWOperating Wayne, PAPJM Jun 20002003
Other project 12, Beaufort County
Other · SCPSA
70.0 MWOperating Beaufort, SCSoutheast Apr 2001target 2005
Hope Creek 1
Nuclear
69.0 MWOperating Salem, NJPJM Jan 20002001
South Bend Generating Station
Gas
68.1 MWOperating Armstrong, PAPJM Mar 20182022
Onshore wind project G507, Fond Du Lac County
Onshore wind
68.0 MWOperating Fond Du Lac, WIMISO Mar 20052005
Waverly Solar
Solar
68.0 MWOperating Sussex, VAPJM Sep 20172024
SR Perry
Solar
68.0 MWOperating Houston, GASoutheast Dec 2023
Onshore wind project GEN-2002-009, Hansford County
Onshore wind
67.2 MWOperating Hansford, TXSPP Jul 20022006
Arche Energy Project
Solar
67.0 MWOperating Fulton, OHPJM Mar 20192024
Solar project 291, Colbert County
Solar
67.0 MWOperating Colbert, ALSoutheast Apr 2016
Phillips Island CT1, CT2, CT3, and ST4
Gas
67.0 MWOperating Delaware, PAPJM Sep 20172020
Other project G941, Butler County
Other
67.0 MWOperating Butler, OHMISO Dec 20072012
Holtsville Emergency Gen
Gas · KeySpan Energy for LIPA
66.0 MWOperating Suffolk, NYNYISO May 2002
Chestnut Solar
Solar
66.0 MWOperating Halifax, NCPJM Feb 20152019
RISEP Increase
Gas
66.0 MWOperating Providence, RIISO-NE May 2010target 2012
Holtsville Emergency Gen
Gas · KeySpan Energy for LIPA
66.0 MWOperating Suffolk, NYNYISO May 2003
Battleground
Gas · Oxy Vinyls, Inc
66.0 MWOperating ERCOT Sep 2003target 1982
Onshore wind project J091, Hancock County
Onshore wind
66.0 MWOperating Hancock, IAMISO Oct 20092011
Shoreham Emergency Gen
Gas · KeySpan Energy for LIPA
66.0 MWOperating Suffolk, NYNYISO May 2002
Holtsville Emergency Gen
Gas · KeySpan Energy for LIPA
66.0 MWOperating NYNYISO May 2002
Caden Energix Axton
Solar
66.0 MWOperating Henry, VAPJM Sep 20182024
Holtsville Emergency Gen
Gas · KeySpan Energy for LIPA
66.0 MWOperating NYNYISO May 2003
Shoreham Emergency Gen
Gas · KeySpan Energy for LIPA
66.0 MWOperating NYNYISO May 2002
Onshore wind project J614, Howard County
Onshore wind
66.0 MWOperating Howard, IAMISO May 20162018
P2 Highland Hills DGR
Other · Life Cycle Power
66.0 MWOperating ERCOT Jun 20252025
Spruance Operating Services LLC
Gas
66.0 MWOperating Henrico, VAPJM Mar 20182019
Liberty Electric
Gas
65.5 MWOperating Delaware, PAPJM Sep 20122015
Onshore wind project Q6, Navajo County
Onshore wind
65.1 MWOperating Navajo, AZWest Apr 2005target 2011
Other project 33, Georgetown County
Other · IPCO
65.0 MWOperating Georgetown, SCSoutheast Oct 2011target 2012
GRP Franklin
Other
65.0 MWOperating Franklin, GASoutheast 2019
Coal project GEN-2008-002, Platte County
Coal
65.0 MWOperating Platte, MOSPP Jan 20082009
GPC Mossy Branch Battery Storage Station
Battery storage
65.0 MWOperating Talbot, GASoutheast Apr 20202024
GRP Madison
Other
65.0 MWOperating Madison, GASoutheast 2019
North Anna Unit 1
Nuclear
65.0 MWOperating Louisa, VAPJM Jul 20072010
Onshore wind project 5, Kittitas County
Onshore wind
65.0 MWOperating Kittitas, WAWest Oct 20052009
Otay Mesa
Gas
65.0 MWOperating San Diego, CACAISO Jan 20032009
Northumberland Solar
Solar
65.0 MWOperating Northumberland, PAPJM Jan 20192025
Kibby Wind Project
Onshore wind
65.0 MWOperating Franklin, MEISO-NE Sep 2005target 2009
North Anna Unit 2
Nuclear
65.0 MWOperating Louisa, VAPJM Jul 20072010
Hawtree Creek
Solar
65.0 MWOperating Warren, NCPJM Aug 20162021
Freedom Generation Plant
Gas
65.0 MWOperating Luzerne, PAPJM Mar 20172023
Windthorst 2
Onshore wind · OwnEnergy
65.0 MWOperating ERCOT Jun 20122014
Solar project 17, Hillsborough County
Solar
65.0 MWOperating Hillsborough, FLSoutheast Apr 2017target 2018
Cyclone Solar
Solar + storage
65.0 MWOperating Kern, CACAISO May 20162025
Solar project J1304, Rock County
Solar
65.0 MWOperating Rock, WIMISO Apr 20192023
Solar project 4910, Duplin County
Solar · Duke Energy Progress, LLC
64.8 MWOperating Duplin, NCSoutheast Apr 20122015
Page 43 of 96

Source: Rand, J. et al., Queued Up, Lawrence Berkeley National Laboratory, data through end of 2025. Compiled from the queues of the 7 ISO/RTOs and dozens of non-ISO utilities. A request is a proposal to connect, not a commitment to build: historically most are withdrawn. Capacity is the requested interconnection size; hybrids include the storage component. Transmission lines · Planned power plants (EIA)