United States β€Ί Grid β€Ί Interconnection queues

ONSHORE WIND Β· ERCOT

Windthorst 2

Windthorst 2 is a 65.0 MW onshore wind request built and operating in the ERCOT interconnection queue.

Queue statusOperating
  1. PlanningQueued Jun 2012 (completed)
  2. ConsentedAug 2013 (completed)
  3. Construction (completed)
  4. OperatingDec 2014 (current stage)
  5. Closed (not yet reached)

Request details

Queue ID
13INR0057
Grid region
ERCOT (Texas)
Developer
OwnEnergy
Connection point (POI)
Bowie-Cottonwood 69kV (772-1605)
Technology
Wind: 65.0 MW
Total requested
65.0 MW
Study phase
IA
Queue status
Operational
Entered queue
20 June 2012
Agreement signed
15 August 2013
Proposed online date
October 2014
Came online
December 2014

Location

No county location in the queue data.

Power plants in Β· Transmission lines in

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem