SOLAR · SOUTHEASTSolar project 4910, Duplin County
Solar project 4910, Duplin County is a 64.8 MW solar request built and operating in the Southeast interconnection queue, in Duplin County, North Carolina, connecting to Duke Energy Progress.
Request details
- Queue ID
- 4910
- Grid region
- Southeast (non-ISO utilities)
- Utility / transmission owner
- Duke Energy Progress
- Developer
- Duke Energy Progress, LLC
- Connection point (POI)
- Clinton - Wallace 230 kV Line; Clinton - Wallace 230 kV Line
- Location
- Duplin County, North Carolina
- Technology
- Solar: 64.8 MW
- Total requested
- 64.8 MW
- Study phase
- Commercial Operation - Commercial Operation Date Declared
- Queue status
- Operational
- Entered queue
- 26 April 2012
- Proposed online date
- December 2015
- Came online
- December 2015
Location
Marker shows the centre of Duplin County; the queue data does not give exact sites.
Power plants in North Carolina · Transmission lines in North Carolina
Other requests in Duplin County
- Other project PP00051, Duplin CountyOther · 80.0 MW · in study
- Other project PP00044, Duplin CountyOther · 80.0 MW · in study
- Solar project 962971, Duplin CountySolar · 80.0 MW · in study
- Solar project 177046, Duplin CountySolar · 275 MW · withdrawn
- Solar project 569238, Duplin CountySolar · 112 MW · withdrawn
- Solar project 568978, Duplin CountySolar · 80.0 MW · withdrawn
- Solar project 569144, Duplin CountySolar · 80.0 MW · withdrawn
- Solar project 917677, Duplin CountySolar · 80.0 MW · withdrawn
- Solar project 153790, Duplin CountySolar · 72.0 MW · withdrawn
- Solar project 963103, Duplin CountySolar · 49.9 MW · withdrawn
- Solar project 920715, Duplin CountySolar · 49.9 MW · withdrawn
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem