United States › Grid › Interconnection queues › North Carolina
OTHER · SOUTHEASTOther project PP00051, Duplin County
Other project PP00051, Duplin County is a 80.0 MW other request in interconnection study in the Southeast interconnection queue, in Duplin County, North Carolina, connecting to Duke Energy Progress.
- PlanningQueued Aug 2025 (current stage)
- Consented (not yet reached)
- Construction (not yet reached)
- OperatingTarget Feb 2029 (not yet reached)
- Closed (not yet reached)
Studies assess what grid upgrades the project would need and who pays for them. A signed interconnection agreement is the main step before construction.
Request details
- Queue ID
- PP00051
- Grid region
- Southeast (non-ISO utilities)
- Utility / transmission owner
- Duke Energy Progress
- Connection point (POI)
- Tri-County EMC Mt Olive POD 115 Tap Line
- Location
- Duplin County, North Carolina
- Technology
- Other: 80.0 MW
- Total requested
- 80.0 MW
- Study phase
- Provisional Study in Progress
- Queue status
- Active
- Entered queue
- 19 August 2025
- Proposed online date
- February 2029
Location
Marker shows the centre of Duplin County; the queue data does not give exact sites.
Power plants in North Carolina · Transmission lines in North Carolina
Other requests in Duplin County
- Other project PP00044, Duplin CountyOther · 80.0 MW · in study
- Solar project 962971, Duplin CountySolar · 80.0 MW · in study
- Solar project 4910, Duplin CountySolar · 64.8 MW · built
- Solar project 177046, Duplin CountySolar · 275 MW · withdrawn
- Solar project 569238, Duplin CountySolar · 112 MW · withdrawn
- Solar project 568978, Duplin CountySolar · 80.0 MW · withdrawn
- Solar project 569144, Duplin CountySolar · 80.0 MW · withdrawn
- Solar project 917677, Duplin CountySolar · 80.0 MW · withdrawn
- Solar project 153790, Duplin CountySolar · 72.0 MW · withdrawn
- Solar project 963103, Duplin CountySolar · 49.9 MW · withdrawn
- Solar project 920715, Duplin CountySolar · 49.9 MW · withdrawn
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem