SOLAR Β· PJMWaverly Solar
Waverly Solar is a 68.0 MW solar request built and operating in the PJM interconnection queue, in Sussex County, Virginia, connecting to Dominion.
Request details
- Queue ID
- AD1-082
- Grid region
- PJM (Mid-Atlantic, Midwest)
- Utility / transmission owner
- Dominion
- Connection point (POI)
- Bakers Pond-Ivor 115kV
- Location
- Sussex County, Virginia
- Technology
- Solar: 68.0 MW
- Total requested
- 68.0 MW
- Service type
- Network resource (NRIS)
- Study phase
- Available studies: Feasibility Study, System Impact Study, Facilities Study; Interim/Interconnection Service Agreement:
- Queue status
- Operational
- Entered queue
- 8 September 2017
- Proposed online date
- February 2024
- Came online
- March 2024
Location
Marker shows the centre of Sussex County; the queue data does not give exact sites.
Other requests in Sussex County
- Blackwater SolarSolar Β· 800 MW Β· agreement signed
- Cassius Blue SolarSolar + storage Β· 300 MW Β· agreement signed
- Big Pine SolarSolar Β· 150 MW Β· agreement signed
- Cassius Blue SolarSolar + storage Β· 94.0 MW Β· agreement signed
- Shands Energy CenterBattery storage Β· 15.7 MW Β· agreement signed
- Solar project AG2-436, Sussex CountySolar Β· 350 MW Β· in study
- Battery storage project AG2-339, Sussex CountyBattery storage Β· 85.0 MW Β· in study
- Solar + storage project AG2-426, Sussex CountySolar + storage Β· 33.5 MW Β· in study
- Enclave Solar Energy CenterSolar Β· 149 MW Β· suspended
- Waverly SolarSolar Β· 50.0 MW Β· built
- Solar project AB2-025, Sussex CountySolar Β· 20.0 MW Β· built
- Solar project AG1-178, Sussex CountySolar Β· 500 MW Β· withdrawn
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem