United States › Grid › Interconnection queues › Wisconsin
ONSHORE WIND · MISOOnshore wind project G507, Fond Du Lac County
Onshore wind project G507, Fond Du Lac County is a 68.0 MW onshore wind request built and operating in the MISO interconnection queue, in Fond Du Lac County, Wisconsin.
Request details
- Queue ID
- G507
- Grid region
- MISO (Midcontinent)
- Connection point (POI)
- Near intersection of 138kV line X-2 (OHM-MUR), 345kV line W-1 (SFL-EDG), and 345kV line 971L51 (FJT-ADN)
- Location
- Fond Du Lac County, Wisconsin
- Technology
- Wind: 68.0 MW
- Total requested
- 68.0 MW
- Study phase
- Network Upgrade
- Queue status
- Operational
- Entered queue
- 11 March 2005
- Agreement signed
- 1 February 2007
- Proposed online date
- November 2005
- Came online
- November 2005
Location
Marker shows the centre of Fond Du Lac County; the queue data does not give exact sites.
Other requests in Fond Du Lac County
- Gas project J4115, Fond Du Lac CountyGas · 525 MW · in study
- Battery storage project J3160, Fond Du Lac CountyBattery storage · 100 MW · in study
- Onshore wind project G507b, Fond Du Lac CountyOnshore wind · 98.0 MW · built
- Onshore wind project G353, Fond Du Lac CountyOnshore wind · 80.0 MW · built
- Onshore wind project G354, Fond Du Lac CountyOnshore wind · 80.0 MW · built
- Other project G048, Fond Du Lac CountyOther · 725 MW · withdrawn
- Onshore wind project G335, Fond Du Lac CountyOnshore wind · 160 MW · withdrawn
- Solar project J1253, Fond Du Lac CountySolar · 100 MW · withdrawn
- Solar project J1716, Fond Du Lac CountySolar · 100 MW · withdrawn
- Onshore wind project J146, Fond Du Lac CountyOnshore wind · 99.0 MW · withdrawn
- Onshore wind project G427, Fond Du Lac CountyOnshore wind · 98.0 MW · withdrawn
- Solar project J1994, Fond Du Lac CountySolar · 97.1 MW · withdrawn
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem