United States βΊ Grid βΊ Interconnection queues βΊ Wisconsin
ONSHORE WIND Β· MISOOnshore wind project J146, Fond Du Lac County
Onshore wind project J146, Fond Du Lac County is a 99.0 MW onshore wind request withdrawn in the MISO interconnection queue, in Fond Du Lac County, Wisconsin.
Queue statusWithdrawn / abandoned
- PlanningQueued Jun 2010 (completed)
- Withdrawn / abandonedMay 2011 (project stopped here)
- ConsentedMay 2011 (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- J146
- Grid region
- MISO (Midcontinent)
- Connection point (POI)
- ATC Green Lake - N. Fond du Lac 138 kV
- Location
- Fond Du Lac County, Wisconsin
- Technology
- Wind: 99.0 MW
- Total requested
- 99.0 MW
- Study phase
- SPA - SIS
- Queue status
- Withdrawn
- Entered queue
- 28 June 2010
- Agreement signed
- 13 May 2011
- Proposed online date
- March 2012
- Withdrawn
- May 2011
Location
Marker shows the centre of Fond Du Lac County; the queue data does not give exact sites.
Power plants in Wisconsin Β· Transmission lines in Wisconsin
Other requests in Fond Du Lac County
- Gas project J4115, Fond Du Lac CountyGas Β· 525 MW Β· in study
- Battery storage project J3160, Fond Du Lac CountyBattery storage Β· 100 MW Β· in study
- Onshore wind project G507b, Fond Du Lac CountyOnshore wind Β· 98.0 MW Β· built
- Onshore wind project G353, Fond Du Lac CountyOnshore wind Β· 80.0 MW Β· built
- Onshore wind project G354, Fond Du Lac CountyOnshore wind Β· 80.0 MW Β· built
- Onshore wind project G507, Fond Du Lac CountyOnshore wind Β· 68.0 MW Β· built
- Other project G048, Fond Du Lac CountyOther Β· 725 MW Β· withdrawn
- Onshore wind project G335, Fond Du Lac CountyOnshore wind Β· 160 MW Β· withdrawn
- Solar project J1253, Fond Du Lac CountySolar Β· 100 MW Β· withdrawn
- Solar project J1716, Fond Du Lac CountySolar Β· 100 MW Β· withdrawn
- Onshore wind project G427, Fond Du Lac CountyOnshore wind Β· 98.0 MW Β· withdrawn
- Solar project J1994, Fond Du Lac CountySolar Β· 97.1 MW Β· withdrawn
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem