United States › Grid › Interconnection queues › Wisconsin
GAS · MISOGas project J4115, Fond Du Lac County
Gas project J4115, Fond Du Lac County is a 525 MW gas request in interconnection study in the MISO interconnection queue, in Fond Du Lac County, Wisconsin, connecting to AMERICAN TRANSMISSION COMPANY.
- PlanningQueued Oct 2025 (current stage)
- Consented (not yet reached)
- Construction (not yet reached)
- OperatingTarget Jun 2028 (not yet reached)
- Closed (not yet reached)
Studies assess what grid upgrades the project would need and who pays for them. A signed interconnection agreement is the main step before construction.
Request details
- Queue ID
- J4115
- Grid region
- MISO (Midcontinent)
- Utility / transmission owner
- AMERICAN TRANSMISSION COMPANY
- Connection point (POI)
- South Fond du Lac - Fitzgerald 345.0kV
- Location
- Fond Du Lac County, Wisconsin
- Technology
- Gas: 525 MW
- Total requested
- 525 MW
- Service type
- Network resource (NRIS)
- Queue status
- Active
- Entered queue
- 6 October 2025
- Proposed online date
- June 2028
Location
Marker shows the centre of Fond Du Lac County; the queue data does not give exact sites.
Other requests in Fond Du Lac County
- Battery storage project J3160, Fond Du Lac CountyBattery storage · 100 MW · in study
- Onshore wind project G507b, Fond Du Lac CountyOnshore wind · 98.0 MW · built
- Onshore wind project G353, Fond Du Lac CountyOnshore wind · 80.0 MW · built
- Onshore wind project G354, Fond Du Lac CountyOnshore wind · 80.0 MW · built
- Onshore wind project G507, Fond Du Lac CountyOnshore wind · 68.0 MW · built
- Other project G048, Fond Du Lac CountyOther · 725 MW · withdrawn
- Onshore wind project G335, Fond Du Lac CountyOnshore wind · 160 MW · withdrawn
- Solar project J1253, Fond Du Lac CountySolar · 100 MW · withdrawn
- Solar project J1716, Fond Du Lac CountySolar · 100 MW · withdrawn
- Onshore wind project J146, Fond Du Lac CountyOnshore wind · 99.0 MW · withdrawn
- Onshore wind project G427, Fond Du Lac CountyOnshore wind · 98.0 MW · withdrawn
- Solar project J1994, Fond Du Lac CountySolar · 97.1 MW · withdrawn
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem