United States β€Ί Grid β€Ί Interconnection queues β€Ί Wisconsin

SOLAR Β· MISO

Solar project J1253, Fond Du Lac County

Solar project J1253, Fond Du Lac County is a 100 MW solar request withdrawn in the MISO interconnection queue, in Fond Du Lac County, Wisconsin, connecting to American Transmission Co..

Queue statusWithdrawn / abandoned
  1. PlanningQueued Apr 2019 (completed)
  2. Withdrawn / abandonedOct 2024 (project stopped here)
  3. ConsentedApr 2023 (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
J1253
Grid region
MISO (Midcontinent)
Utility / transmission owner
American Transmission Co.
Connection point (POI)
South Fond Du Lac to Fitzgerald 345 kV line
Location
Fond Du Lac County, Wisconsin
Technology
Solar: 100 MW
Total requested
100 MW
Service type
Network resource (NRIS)
Study phase
Study Phase: GIA; Post GIA Status: Withdrawn
Queue status
Withdrawn
Entered queue
29 April 2019
Agreement signed
6 April 2023
Proposed online date
August 2024
Withdrawn
October 2024

Location

Marker shows the centre of Fond Du Lac County; the queue data does not give exact sites.

Power plants in Wisconsin Β· Transmission lines in Wisconsin

Other requests in Fond Du Lac County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem