Phillips Island CT1, CT2, CT3, and ST4 is a 67.0 MW gas request built and operating in the PJM interconnection queue, in Delaware County, Pennsylvania, connecting to PECO.

Queue statusOperating
  1. PlanningQueued Sep 2017 (completed)
  2. Consented (completed)
  3. Construction (completed)
  4. OperatingJun 2020 (current stage)
  5. Closed (not yet reached)

Request details

Queue ID
AD1-097
Grid region
PJM (Mid-Atlantic, Midwest)
Utility / transmission owner
PECO
Connection point (POI)
Linwood 230 kV II
Location
Delaware County, Pennsylvania
Technology
Gas: 67.0 MW
Total requested
67.0 MW
Service type
Network resource (NRIS)
Study phase
Available studies: Feasibility Study, System Impact Study; Interim/Interconnection Service Agreement: Document Posted
Queue status
Operational
Entered queue
20 September 2017
Proposed online date
July 2021
Came online
June 2020

Location

Marker shows the centre of Delaware County; the queue data does not give exact sites.

Power plants in Pennsylvania · Transmission lines in Pennsylvania

Other requests in Delaware County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem