United States βΊ Grid βΊ Interconnection queues βΊ Pennsylvania
COAL Β· PJMEddystone
Eddystone is a 7.0 MW coal request built and operating in the PJM interconnection queue, in Delaware County, Pennsylvania, connecting to PECO.
Request details
- Queue ID
- M27
- Grid region
- PJM (Mid-Atlantic, Midwest)
- Utility / transmission owner
- PECO
- Connection point (POI)
- Eddystone 138kV
- Location
- Delaware County, Pennsylvania
- Technology
- Coal: 7.0 MW
- Total requested
- 7.0 MW
- Service type
- Network resource (NRIS)
- Study phase
- Available studies: Feasibility Study, System Impact Study; Interim/Interconnection Service Agreement: Document Posted
- Queue status
- Operational
- Entered queue
- 30 July 2004
- Proposed online date
- June 2004
- Came online
- December 2006
Location
Marker shows the centre of Delaware County; the queue data does not give exact sites.
Power plants in Pennsylvania Β· Transmission lines in Pennsylvania
Other requests in Delaware County
- Solar project AI1-076, Delaware CountySolar Β· 19.8 MW Β· in study
- Springfield CSG 1Solar Β· 3.9 MW Β· suspended
- Liberty (Eddy)Gas Β· 521 MW Β· built
- Phillips Island CT1, CT2, CT3, and ST4Gas Β· 67.0 MW Β· built
- Liberty ElectricGas Β· 65.5 MW Β· built
- Liberty ElectricGas Β· 35.0 MW Β· built
- Phillips Island CT1, CT2,CT3 & ST4Gas Β· 35.0 MW Β· built
- JerichoGas Β· 29.0 MW Β· built
- Kimberly ClarkOther Β· 20.0 MW Β· built
- LibertyGas Β· 20.0 MW Β· built
- Phillips Island CT1, CT2, CT3, CT4Gas Β· 10.0 MW Β· built
- Sunoil Gen UnitGas Β· 8.0 MW Β· built
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem