South Bend Generating Station

South Bend Generating Station is a 68.1 MW gas request built and operating in the PJM interconnection queue, in Armstrong County, Pennsylvania, connecting to APS.

Queue statusOperating
  1. PlanningQueued Mar 2018 (completed)
  2. Consented (completed)
  3. Construction (completed)
  4. OperatingApr 2022 (current stage)
  5. Closed (not yet reached)

Request details

Queue ID
AD2-113
Grid region
PJM (Mid-Atlantic, Midwest)
Utility / transmission owner
APS
Connection point (POI)
South Bend 500kV
Location
Armstrong County, Pennsylvania
Technology
Gas: 68.1 MW
Total requested
68.1 MW
Service type
Network resource (NRIS)
Study phase
Available studies: Feasibility Study, System Impact Study; Interim/Interconnection Service Agreement: Document Posted
Queue status
Operational
Entered queue
22 March 2018
Proposed online date
June 2023
Came online
April 2022

Location

Marker shows the centre of Armstrong County; the queue data does not give exact sites.

Power plants in Pennsylvania · Transmission lines in Pennsylvania

Other requests in Armstrong County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem