United States › Grid › Interconnection queues › Pennsylvania
SOLAR · PJMMcVille Solar
McVille Solar is a 19.9 MW solar request in interconnection study in the PJM interconnection queue, in Armstrong County, Pennsylvania, connecting to APS.
- PlanningQueued Mar 2025 (current stage)
- Consented (not yet reached)
- Construction (not yet reached)
- OperatingTarget Jun 2023 (not yet reached)
- Closed (not yet reached)
Studies assess what grid upgrades the project would need and who pays for them. A signed interconnection agreement is the main step before construction.
Request details
- Queue ID
- AH1-452
- Grid region
- PJM (Mid-Atlantic, Midwest)
- Utility / transmission owner
- APS
- Developer
- IMG Solar LLC
- Connection point (POI)
- Clementine-Clementine Jct. 25 kV
- Location
- Armstrong County, Pennsylvania
- Technology
- Solar: 19.9 MW
- Total requested
- 19.9 MW
- Service type
- Network resource (NRIS)
- Study phase
- System Impact Study
- Queue status
- Active
- Entered queue
- 14 March 2025
- Proposed online date
- June 2023
Location
Marker shows the centre of Armstrong County; the queue data does not give exact sites.
Power plants in Pennsylvania · Transmission lines in Pennsylvania
Other requests in Armstrong County
- Solar project AH2-129, Armstrong CountySolar · 36.0 MW · in study
- Solar project AI1-143, Armstrong CountySolar · 19.9 MW · in study
- Solar project AH2-163, Armstrong CountySolar · 19.8 MW · in study
- South Bend CT1 - CT4Gas · 600 MW · built
- South Bend CT1 - CT4Gas · 104 MW · built
- South Bend Generating StationGas · 68.1 MW · built
- South Bend Generating StationGas · 10.0 MW · built
- South Bend Generating StationGas · 6.0 MW · built
- Mahoning Creek Dam Hydro ProjectHydro · 6.0 MW · built
- Gas project AC2-118, Armstrong CountyGas · 1,200 MW · withdrawn
- Gas project F05, Armstrong CountyGas · 646 MW · withdrawn
- Gas project B10, Armstrong CountyGas · 600 MW · withdrawn
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem