United States › Grid › Interconnection queues

OCTARY USA · INTERCONNECTION QUEUES

Withdrawn queue requests in CAISO (California) — page 43

Before a new power plant or battery can connect to the US grid, it joins a queue for studies and an interconnection agreement. Most requests never get built. This shows every request: active, built and withdrawn.

Requests shown2,186619.9 GW
Active in queue188.6 GW429 requests
Agreement signed96.2 GW235 requests
Withdrawn2,186619.9 GW never built

Map

Loading requests…
In studyAgreement signedUnder constructionBuiltSuspendedWithdrawn

Requests

2,186 requests · page 43 of 44
ProjectCapacityStatusLocationRegionQueuedOnline
Re Lincoln
Solar
12.0 MWWithdrawn / abandoned Kings, CACAISO Mar 2011target 2014
Des
Solar
11.8 MWWithdrawn / abandoned Fresno, CACAISO Aug 2010target 2013
Mount Lassen Power Plant
Other
11.4 MWWithdrawn / abandoned Lassen, CACAISO Apr 2023target 2028
Repowered Mckittrick Cogen Plant
Gas
11.2 MWWithdrawn / abandoned Kern, CACAISO Jul 2010target 2011
Ripon LM6000 Repower
Gas
11.0 MWWithdrawn / abandoned San Joaquin, CACAISO Apr 2012target 2018
Rough Acres Solar
Solar
10.4 MWWithdrawn / abandoned San Diego, CACAISO May 2010target 2011
Blacktail Energy Storage
Battery storage
10.1 MWWithdrawn / abandoned Monterey, CACAISO Apr 2023target 2028
PV Rosina 1 SG
Solar
10.0 MWWithdrawn / abandoned Kern, CACAISO May 2010target 2011
Rosina Bio Verde
Solar
10.0 MWWithdrawn / abandoned Kings, CACAISO Feb 2010target 2012
White River 3 BESS
Battery storage
10.0 MWWithdrawn / abandoned Tulare, CACAISO Apr 2015target 2019
Eco Energy Storage Center
Battery storage
10.0 MWWithdrawn / abandoned San Diego, CACAISO Apr 2014target 2016
Fresno Cogeneration CTG-4
Gas
10.0 MWWithdrawn / abandoned Fresno, CACAISO Apr 2008target 2010
Shingle Springs Es
Battery storage
10.0 MWWithdrawn / abandoned El Dorado, CACAISO Apr 2015target 2020
Molino Es
Battery storage
10.0 MWWithdrawn / abandoned Sonoma, CACAISO Apr 2015target 2020
Old Kearney Es
Battery storage
10.0 MWWithdrawn / abandoned Fresno, CACAISO Apr 2015target 2020
Maverick
Battery storage
10.0 MWWithdrawn / abandoned San Diego, CACAISO May 2017target 2021
Ge Tehachapi Solar Project
Solar
10.0 MWWithdrawn / abandoned Kern, CACAISO Apr 2009target 2010
Jefferson Solar
Solar
10.0 MWWithdrawn / abandoned Fresno, CACAISO Apr 2010target 2012
Paradise Cut
Battery storage
10.0 MWWithdrawn / abandoned San Joaquin, CACAISO Apr 2014target 2016
Point Arena Es
Battery storage
10.0 MWWithdrawn / abandoned Mendocino, CACAISO Apr 2015target 2020
Jayne East
Solar
10.0 MWWithdrawn / abandoned Fresno, CACAISO Jul 2010target 2014
Rosebud
Battery storage
10.0 MWWithdrawn / abandoned San Diego, CACAISO May 2017target 2021
Elk Hills
Solar
10.0 MWWithdrawn / abandoned Kern, CACAISO Nov 2010target 2013
Redwood Landfill
Other
9.9 MWWithdrawn / abandoned Marin, CACAISO Oct 2008target 2014
Potrero Hills Energy
Other
9.6 MWWithdrawn / abandoned Solano, CACAISO Feb 2010target 2013
BRJ
Solar
8.0 MWWithdrawn / abandoned Fresno, CACAISO Aug 2010target 2013
Reddy I
Solar
8.0 MWWithdrawn / abandoned Kern, CACAISO Mar 2011target 2015
Lemoore WWTP Solar
Solar
7.8 MWWithdrawn / abandoned Kings, CACAISO Mar 2011target 2013
Camden 2
Solar
7.0 MWWithdrawn / abandoned Fresno, CACAISO Mar 2011target 2014
Palco
Other
6.8 MWWithdrawn / abandoned Humboldt, CACAISO Sep 2005target 2006
Spock Energy Storage
Battery storage
6.7 MWWithdrawn / abandoned CACAISO Apr 2023target 2029
Golden Prism
Battery storage
6.0 MWWithdrawn / abandoned Kern, CACAISO Apr 2015target 2020
Ivanpah 1- Expansion
Solar
6.0 MWWithdrawn / abandoned San Bernardino, CACAISO Jul 2009target 2012
Terra Gen Dixie Valley Expansion
Geothermal
5.6 MWWithdrawn / abandoned Churchill, NVCAISO Jul 2010target 2011
Camptonville BIOPOWER1
Other
5.5 MWWithdrawn / abandoned Yuba, CACAISO Apr 2019target 2022
Wellhead Power Project 5
Other
5.2 MWWithdrawn / abandoned Fresno, CACAISO Jan 2008target 2009
Wellhead Power Panoche, LLC
Battery storage
5.0 MWWithdrawn / abandoned Fresno, CACAISO Jul 2020target 2021
Columbia Solar Energy
Solar
5.0 MWWithdrawn / abandoned Contra Costa, CACAISO Mar 2011target 2012
Lodi 5
Solar
5.0 MWWithdrawn / abandoned San Joaquin, CACAISO Mar 2011target 2012
Blue Sands Solar PV
Solar
5.0 MWWithdrawn / abandoned Nye, NVCAISO Apr 2015target 2015
Re Jameson
Solar
5.0 MWWithdrawn / abandoned Fresno, CACAISO Mar 2011target 2013
Sweetwater Energy Storage
Battery storage
5.0 MWWithdrawn / abandoned San Diego, CACAISO Oct 2014target 2016
Clearvista Solar 1
Solar
5.0 MWWithdrawn / abandoned Kern, CACAISO Jan 2014target 2014
819 Hanford Solar I
Solar
5.0 MWWithdrawn / abandoned Kings, CACAISO Mar 2011target 2012
Re Cobb
Solar
5.0 MWWithdrawn / abandoned Kern, CACAISO Mar 2011target 2013
Otay Mesa Cinco
Battery storage
5.0 MWWithdrawn / abandoned San Diego, CACAISO Apr 2015target 2017
El Dorado Solar Generating Station Project
Solar
5.0 MWWithdrawn / abandoned Clark, NVCAISO Apr 2007target 2014
Zannon Solar
Solar
5.0 MWWithdrawn / abandoned Santa Barbara, CACAISO Nov 2011target 2013
Dixie Valley 2
Geothermal
5.0 MWWithdrawn / abandoned Churchill, NVCAISO Mar 2014target 2014
Stockton Biomass
Other
5.0 MWWithdrawn / abandoned San Joaquin, CACAISO Apr 2014target 2018
Page 43 of 44

Source: Rand, J. et al., Queued Up, Lawrence Berkeley National Laboratory, data through end of 2025. Compiled from the queues of the 7 ISO/RTOs and dozens of non-ISO utilities. A request is a proposal to connect, not a commitment to build: historically most are withdrawn. Capacity is the requested interconnection size; hybrids include the storage component. Transmission lines · Planned power plants (EIA)