Dixie Valley 2

Dixie Valley 2 is a 5.0 MW geothermal request withdrawn in the CAISO interconnection queue, in Churchill County, Nevada, connecting to SCE.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Mar 2014 (completed)
  2. Withdrawn / abandonedOct 2014 (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
1006
Grid region
CAISO (California)
Utility / transmission owner
SCE
Connection point (POI)
Control Substation 115kV
Location
Churchill County, Nevada
Technology
Geothermal: 5.0 MW
Total requested
5.0 MW
Service type
Energy only (ERIS)
Study phase
System Impact Study
Queue status
Withdrawn
Entered queue
28 March 2014
Proposed online date
October 2014
Withdrawn
October 2014

Location

Marker shows the centre of Churchill County; the queue data does not give exact sites.

Power plants in Nevada Β· Transmission lines in Nevada

Other requests in Churchill County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem