Blue Sands Solar PV

Blue Sands Solar PV is a 5.0 MW solar request withdrawn in the CAISO interconnection queue, in Nye County, Nevada, connecting to VEA.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Apr 2015 (completed)
  2. Withdrawn / abandonedAug 2015 (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
1095
Grid region
CAISO (California)
Utility / transmission owner
VEA
Connection point (POI)
Valley Substation 138kV
Location
Nye County, Nevada
Technology
Solar: 5.0 MW
Total requested
5.0 MW
Service type
Energy only (ERIS)
Study phase
System Impact Study
Queue status
Withdrawn
Entered queue
7 April 2015
Proposed online date
December 2015
Withdrawn
August 2015

Location

Marker shows the centre of Nye County; the queue data does not give exact sites.

Power plants in Nevada Β· Transmission lines in Nevada

Other requests in Nye County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem