Wellhead Power Panoche, LLC

Wellhead Power Panoche, LLC is a 5.0 MW battery storage request withdrawn in the CAISO interconnection queue, in Fresno County, California, connecting to PGAE.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Jul 2020 (completed)
  2. Withdrawn / abandonedAug 2025 (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
1828
Grid region
CAISO (California)
Utility / transmission owner
PGAE
Connection point (POI)
Panoche 115 kV
Location
Fresno County, California
Technology
Battery: 5.0 MW
Total requested
5.0 MW
Service type
Energy only (ERIS)
Study phase
System Impact Study
Queue status
Withdrawn
Entered queue
14 July 2020
Proposed online date
April 2021
Withdrawn
August 2025

Location

Marker shows the centre of Fresno County; the queue data does not give exact sites.