United States › Grid › Interconnection queues › California

OTHER · CAISO

Wellhead Power Project 5

Wellhead Power Project 5 is a 5.2 MW other request withdrawn in the CAISO interconnection queue, in Fresno County, California, connecting to PGAE.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Jan 2008 (completed)
  2. Withdrawn / abandonedDec 2008 (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
293
Grid region
CAISO (California)
Utility / transmission owner
PGAE
Connection point (POI)
Helm-Kerman 70kV line
Location
Fresno County, California
Technology
Other: 5.2 MW
Total requested
5.2 MW
Study phase
System Impact Study
Queue status
Withdrawn
Entered queue
3 January 2008
Proposed online date
June 2009
Withdrawn
December 2008

Location

Marker shows the centre of Fresno County; the queue data does not give exact sites.

Power plants in California · Transmission lines in California

Other requests in Fresno County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem