White River 3 BESS

White River 3 BESS is a 10.0 MW battery storage request withdrawn in the CAISO interconnection queue, in Tulare County, California, connecting to PGAE.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Apr 2015 (completed)
  2. Withdrawn / abandonedMay 2017 (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
1162
Grid region
CAISO (California)
Utility / transmission owner
PGAE
Connection point (POI)
Olive Switching Station 115kV
Location
Tulare County, California
Technology
Battery: 10.0 MW
Total requested
10.0 MW
Service type
Network resource (NRIS)
Study phase
System Impact Study
Queue status
Withdrawn
Entered queue
30 April 2015
Proposed online date
December 2019
Withdrawn
May 2017

Location

Marker shows the centre of Tulare County; the queue data does not give exact sites.

Power plants in California · Transmission lines in California

Other requests in Tulare County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem