United States βΊ Grid βΊ Interconnection queues βΊ California
BATTERY STORAGE Β· CAISOMolino Es
Molino Es is a 10.0 MW battery storage request withdrawn in the CAISO interconnection queue, in Sonoma County, California, connecting to PGAE.
Queue statusWithdrawn / abandoned
- PlanningQueued Apr 2015 (completed)
- Withdrawn / abandonedApr 2016 (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- 1107
- Grid region
- CAISO (California)
- Utility / transmission owner
- PGAE
- Connection point (POI)
- Molino Substation 60kV bus
- Location
- Sonoma County, California
- Technology
- Battery: 10.0 MW
- Total requested
- 10.0 MW
- Service type
- Network resource (NRIS)
- Study phase
- System Impact Study
- Queue status
- Withdrawn
- Entered queue
- 30 April 2015
- Proposed online date
- March 2020
- Withdrawn
- April 2016
Location
Marker shows the centre of Sonoma County; the queue data does not give exact sites.
Power plants in California Β· Transmission lines in California
Other requests in Sonoma County
- Wildhorse Energy CenterBattery storage Β· 122 MW Β· in study
- Mayacamas GeothermalGeothermal Β· 53.0 MW Β· in study
- Borealis Energy StorageBattery storage Β· 314 MW Β· withdrawn
- MyrtleSolar + storage Β· 216 MW Β· withdrawn
- Blitz Energy StorageBattery storage Β· 214 MW Β· withdrawn
- Brix Energy StorageBattery storage Β· 214 MW Β· withdrawn
- North Bay Energy StorageBattery storage Β· 103 MW Β· withdrawn
- North Bay Energy Storage 2Battery storage Β· 102 MW Β· withdrawn
- Pintail Energy StorageBattery storage Β· 100 MW Β· withdrawn
- New GeysersGeothermal Β· 50.0 MW Β· withdrawn
- CPN Wild Horse GeothermalGeothermal Β· 42.0 MW Β· withdrawn
- Kuiper Energy StorageBattery storage Β· 40.5 MW Β· withdrawn
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem