United States β€Ί Grid β€Ί Interconnection queues β€Ί California

SOLAR Β· CAISO

Clearvista Solar 1

Clearvista Solar 1 is a 5.0 MW solar request withdrawn in the CAISO interconnection queue, in Kern County, California, connecting to SCE.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Jan 2014 (completed)
  2. Withdrawn / abandonedJul 2014 (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
1004
Grid region
CAISO (California)
Utility / transmission owner
SCE
Connection point (POI)
Highwind Substation 220kV
Location
Kern County, California
Technology
Solar: 5.0 MW
Total requested
5.0 MW
Service type
Energy only (ERIS)
Study phase
System Impact Study
Queue status
Withdrawn
Entered queue
23 January 2014
Proposed online date
October 2014
Withdrawn
July 2014

Location

Marker shows the centre of Kern County; the queue data does not give exact sites.