| Project | Capacity | Status |
|---|---|---|
| Maple Hill-Fiddlers 1 SP (Bear Rock) Solar ยท CPV Maple Hill Solar, LLC |
50.0 MW | In study |
| Bayonne Energy Center III Battery storage ยท Bayonne Energy Center III, LLC |
49.8 MW | In study |
| Switchgrass Solar 1 Solar |
49.0 MW | Paused / redesign |
| Air Station 1 Solar + storage |
42.1 MW | In study |
| Solar + storage project 562, Malheur County Solar + storage ยท Moores Hollow PV1, LLC |
42.0 MW | Paused / redesign |
| Amelia Energy Facility Solar ยท Amelia Energy Facility, LLC |
41.0 MW | In study |
| Solar project 103, Lincoln County Solar |
40.0 MW | In study |
| Woodstock Solar Solar |
40.0 MW | Paused / redesign |
| Golden Aster Solar Energy Center Battery storage |
40.0 MW | Paused / redesign |
| Henry County Solar Solar |
40.0 MW | Paused / redesign |
| Cottontail Solar 7 Solar |
35.0 MW | Paused / redesign |
| Meadow Forge Solar Energy Center Solar |
33.0 MW | Paused / redesign |
| Solar + storage project 556, Grant County Solar + storage ยท Prairie City PV1, LLC |
30.0 MW | Paused / redesign |
| Gas project G0620, Umatilla County Gas |
27.0 MW | In study |
| Knickerbocker Storage Other ยท Knickerbocker Solar LLC |
25.0 MW | Paused / redesign |
| Concho Solar I Solar |
20.0 MW | Paused / redesign |
| Momentum Gratz Battery storage |
20.0 MW | Paused / redesign |
| Mountain Holly Solar |
20.0 MW | Paused / redesign |
| Hatchery Solar Solar ยท Hatchery Solar LLC |
20.0 MW | In study |
| Flat Hill Solar Solar ยท Flat Hill Solar NY LLC. |
20.0 MW | In study |
| Kce NY 10 Battery storage ยท KCE NY 10, LLC |
20.0 MW | In study |
| HU-Pauls Solar |
20.0 MW | Paused / redesign |
| Montour 1 Solar |
20.0 MW | Paused / redesign |
| Sparkl BESS Battery storage |
20.0 MW | Paused / redesign |
| Fairway Solar Solar ยท Fairway Solar NY LLC |
20.0 MW | In study |
| Grassy Knoll Solar Solar ยท Grassy Knoll Solar NY LLC |
20.0 MW | In study |
| Dover Solar Solar |
20.0 MW | Paused / redesign |
| HU-Logging Solar |
20.0 MW | Paused / redesign |
| Charles County Solar I Solar |
20.0 MW | Paused / redesign |
| SunEast Hooversville Solar Solar |
20.0 MW | Paused / redesign |
| Hilltop Solar Solar ยท SunEast Hilltop Solar LLC |
20.0 MW | In study |
| CS Hawthorn Solar Solar ยท Hawthorn Solar, LLC |
20.0 MW | In study |
| NY13 Solar Solar ยท Bald Mountain Solar LLC |
20.0 MW | In study |
| SunEast Hooversville Solar Solar |
20.0 MW | Paused / redesign |
| Dolan Solar Solar ยท Dolan Solar, LLC |
20.0 MW | In study |
| Charles County Solar II Solar |
20.0 MW | Paused / redesign |
| Jakes Hollow Solar Solar |
20.0 MW | Paused / redesign |
| Valley Solar Solar ยท Valley Solar NY LLC |
20.0 MW | In study |
| NY37 Solar Solar ยท Sandy Creek Solar LLC |
20.0 MW | In study |
| Solar project GI-2019-5, Garfield County Solar |
19.9 MW | In study |
| G Morris Solar Solar |
17.0 MW | Paused / redesign |
| Concho Solar I Solar |
17.0 MW | Paused / redesign |
| Ce-Filmore Solar |
16.0 MW | Paused / redesign |
| FU-Hanks Solar Solar |
15.7 MW | Paused / redesign |
| Luyster Creek Energy Storage 3 Battery storage ยท Eastern Generation, LLC |
15.0 MW | In study |
| Arthur Kill Energy Storage 1 Battery storage ยท Lighthouse Arthur Kill, LLC |
15.0 MW | In study |
| CL-Route 58 B Solar |
13.5 MW | Paused / redesign |
| Highbanks Solar Solar ยท Highbanks Solar LLC |
12.5 MW | In study |
| SunEast Hooversville Solar Solar |
10.0 MW | Paused / redesign |
| Maryland Offshore Wind Energy Project (MOWEP) Offshore wind |
7.3 MW | Paused / redesign |
Capacity in the queue by state
Click a state to drill down.
By grid region
ISO/RTO markets and the non-ISO West and Southeast.
- West (non-ISO utilities)46 ยท 17.8 GW
- PJM (Mid-Atlantic, Midwest)60 ยท 7,820 MW
- ERCOT (Texas)38 ยท 5,908 MW
- NYISO (New York)31 ยท 2,705 MW
- CAISO (California)3 ยท 2,352 MW
- Southeast (non-ISO utilities)12 ยท 1,469 MW
- MISO (Midcontinent)7 ยท 1,168 MW
- SPP (Southwest Power Pool)5 ยท 558 MW
Requests by year joined
Capacity of requests in this view, by the year they entered the queue. Click a year.
Source: Rand, J. et al., Queued Up, Lawrence Berkeley National Laboratory, data through end of 2025. Compiled from the queues of the 7 ISO/RTOs and dozens of non-ISO utilities. A request is a proposal to connect, not a commitment to build: historically most are withdrawn. Capacity is the requested interconnection size; hybrids include the storage component. Transmission lines ยท Planned power plants (EIA)