United States › Grid › Interconnection queues › Washington

SOLAR · WEST

Solar project 103, Lincoln County

Solar project 103, Lincoln County is a 40.0 MW solar request in interconnection study in the West interconnection queue, in Lincoln County, Washington, connecting to Avista Utilities.

Queue statusIn planning
  1. PlanningQueued Dec 2019 (current stage)
  2. Consented (not yet reached)
  3. Construction (not yet reached)
  4. OperatingTarget Jul 2021 (not yet reached)
  5. Closed (not yet reached)

Studies assess what grid upgrades the project would need and who pays for them. A signed interconnection agreement is the main step before construction.

Request details

Queue ID
103
Grid region
West (non-ISO utilities)
Utility / transmission owner
Avista Utilities
Connection point (POI)
Harrington Substation 115 kV
Location
Lincoln County, Washington
Technology
Solar: 40.0 MW
Total requested
40.0 MW
Service type
Network resource (NRIS)
Queue status
Active
Entered queue
10 December 2019
Proposed online date
July 2021

Location

Marker shows the centre of Lincoln County; the queue data does not give exact sites.

Power plants in Washington · Transmission lines in Washington

Other requests in Lincoln County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem