United States βΊ Grid βΊ Interconnection queues βΊ Washington
SOLAR + STORAGE Β· WESTSolar + storage project TCS-16, Lincoln County
Solar + storage project TCS-16, Lincoln County is a 125 MW solar + storage request withdrawn in the West interconnection queue, in Lincoln County, Washington, connecting to Avista Utilities.
Queue statusWithdrawn / abandoned
- PlanningQueued Jan 2021 (completed)
- Withdrawn / abandonedAug 2022 (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- TCS-16
- Grid region
- West (non-ISO utilities)
- Utility / transmission owner
- Avista Utilities
- Connection point (POI)
- Irby 115kV SS to Wilson Creek 115kV Line
- Location
- Lincoln County, Washington
- Technology
- Solar: 125 MW Β· Battery
- Total requested
- 125 MW
- Service type
- Network resource (NRIS)
- Study phase
- Request Status: Withdrawn; Facilities Study: N/A; Phase One Cluster Study: N/A; Phase One Re-Study: N/A; Phase Two Clust
- Queue status
- Withdrawn
- Entered queue
- 7 January 2021
- Proposed online date
- December 2024
- Withdrawn
- August 2022
Location
Marker shows the centre of Lincoln County; the queue data does not give exact sites.
Power plants in Washington Β· Transmission lines in Washington
Other requests in Lincoln County
- Wind + storage project CS24-15, Lincoln CountyWind + storage Β· 300 MW Β· agreement signed
- Solar project CS23-13, Lincoln CountySolar Β· 40.0 MW Β· agreement signed
- Onshore wind project G0953, Lincoln CountyOnshore wind Β· 600 MW Β· in study
- Onshore wind project G0955, Lincoln CountyOnshore wind Β· 350 MW Β· in study
- Onshore wind project G0954, Lincoln CountyOnshore wind Β· 350 MW Β· in study
- Solar + storage project G0985, Lincoln CountySolar + storage Β· 225 MW Β· in study
- Solar project 103, Lincoln CountySolar Β· 40.0 MW Β· in study
- Solar project 71, Lincoln CountySolar Β· 1.0 MW Β· in study
- Gas project 41, Lincoln CountyGas Β· 0.3 MW Β· in study
- Battery storage project 74, Lincoln CountyBattery storage Β· 0.1 MW Β· built
- Onshore wind project G0860, Lincoln CountyOnshore wind Β· 300 MW Β· withdrawn
- Solar + storage project 112, Lincoln CountySolar + storage Β· 190 MW Β· withdrawn
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem