United States › Grid › Interconnection queues › New York
BATTERY STORAGE · NYISOLuyster Creek Energy Storage 3
Luyster Creek Energy Storage 3 is a 15.0 MW battery storage request in interconnection study in the NYISO interconnection queue, in Queens County, New York, connecting to ConEd.
Queue statusIn planning
- PlanningQueued Oct 2019 (current stage)
- Consented (not yet reached)
- Construction (not yet reached)
- OperatingTarget Mar 2027 (not yet reached)
- Closed (not yet reached)
Studies assess what grid upgrades the project would need and who pays for them. A signed interconnection agreement is the main step before construction.
Request details
- Queue ID
- 930
- Grid region
- NYISO (New York)
- Utility / transmission owner
- ConEd
- Developer
- Eastern Generation, LLC
- Connection point (POI)
- North Queens 27kV
- Location
- Queens County, New York
- Technology
- Battery: 15.0 MW
- Total requested
- 15.0 MW
- Study phase
- SIS, FS
- Queue status
- Active
- Entered queue
- 25 October 2019
- Proposed online date
- March 2027
Location
Marker shows the centre of Queens County; the queue data does not give exact sites.
Other requests in Queens County
- Astoria Energy StorageBattery storage · 100 MW · in study
- Harlem River YardBattery storage · 79.9 MW · in study
- Luyster Creek Energy Storage 2Battery storage · 79.0 MW · in study
- Luyster Creek Energy Storage 1Battery storage · 57.3 MW · in study
- Astoria Energy IIGas · 617 MW · built
- Astoria Energy IIGas · 617 MW · built
- Poletti ExpansionGas · 500 MW · built
- Astoria Energy - Phase 1Gas · 500 MW · built
- Astoria Energy - Phase 1Gas · 500 MW · built
- Poletti ExpansionGas · 500 MW · built
- OW Ocean Winds East 5Offshore wind · 1,600 MW · withdrawn
- EI Steinway 1.1Onshore wind · 1,600 MW · withdrawn
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem