United States βΊ Grid βΊ Interconnection queues βΊ New York
GAS Β· NYISOPoletti Expansion
Poletti Expansion is a 500 MW gas request built and operating in the NYISO interconnection queue, connecting to CONED.
Request details
- Queue ID
- 18
- Grid region
- NYISO (New York)
- Utility / transmission owner
- CONED
- Developer
- NYPA
- Connection point (POI)
- Astoria 138kV
- Location
- New York
- Technology
- Gas: 500 MW
- Total requested
- 500 MW
- Study phase
- SRIS, CY01
- Queue status
- Operational
- Entered queue
- 30 April 1999
Location
Marker shows the centre of County; the queue data does not give exact sites.
Other requests in County
- Astoria Energy StorageBattery storage Β· 100 MW Β· in study
- Harlem River YardBattery storage Β· 79.9 MW Β· in study
- Luyster Creek Energy Storage 2Battery storage Β· 79.0 MW Β· in study
- Luyster Creek Energy Storage 1Battery storage Β· 57.3 MW Β· in study
- Luyster Creek Energy Storage 3Battery storage Β· 15.0 MW Β· in study
- Astoria Energy IIGas Β· 617 MW Β· built
- Astoria Energy IIGas Β· 617 MW Β· built
- Poletti ExpansionGas Β· 500 MW Β· built
- Astoria Energy - Phase 1Gas Β· 500 MW Β· built
- Astoria Energy - Phase 1Gas Β· 500 MW Β· built
- OW Ocean Winds East 5Offshore wind Β· 1,600 MW Β· withdrawn
- EI Steinway 1.1Onshore wind Β· 1,600 MW Β· withdrawn
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem