Requests shown23437.6 GW
Active in queue188.6 GW429 requests
Agreement signed96.2 GW235 requests
Withdrawn2,186619.9 GW never built

Map

Loading requests…
In studyAgreement signedUnder constructionBuiltSuspendedWithdrawn

Requests

234 requests · page 4 of 5
ProjectCapacityStatusLocationRegionQueuedOnline
Palomar Energy Center 2
Gas
35.0 MWOperating San Diego, CACAISO Apr 20132021
Lead
Battery storage
32.7 MWOperating Kings, CACAISO Apr 2020target 2023
Top Gun Energy Storage
Battery storage
30.0 MWOperating San Diego, CACAISO May 20172021
Spi Anderson 2
Other
27.2 MWOperating CACAISO Jul 20102015
West Ford Flat Energy Storage
Battery storage
26.3 MWOperating Lake, CACAISO May 20172024
Aes Redondo Beach Unit 7
Gas
26.0 MWOperating Los Angeles, CACAISO Aug 20072010
Borrego Solar I
Solar
26.0 MWOperating San Diego, CACAISO Apr 20082013
Cascade Energy Storage
Battery storage
25.2 MWOperating San Joaquin, CACAISO May 20162023
Russell City Energy Center FD3 Upgrade
Gas
25.0 MWOperating Alameda, CACAISO Feb 20102013
Mojave Solar
Solar
25.0 MWOperating San Bernardino, CACAISO Apr 20122015
Lecu
Gas
24.0 MWOperating San Joaquin, CACAISO Apr 20132017
Cascade Energy Storage Expansion
Battery storage
20.3 MWOperating San Joaquin, CACAISO May 2021target 2022
Freshwater Solar Generating Facility (Fka Sweetwater PV 20MVA Solar Generating Facility)
Solar
20.0 MWOperating Kings, CACAISO Oct 20092016
Adobe Solar (Fka FRV Adobe Solar)
Solar
20.0 MWOperating Kern, CACAISO May 20102014
Vista Energy Storage
Battery storage
20.0 MWOperating San Diego, CACAISO Apr 20142018
White River PV 20MVA Solar Generation Facility
Solar
20.0 MWOperating Tulare, CACAISO Mar 20092013
Paige Solar
Solar
20.0 MWOperating Fresno, CACAISO Sep 20092017
Western Antelope Blue SKY Ranch A
Solar
20.0 MWOperating Los Angeles, CACAISO Dec 20102014
Kansas South
Solar
20.0 MWOperating Kings, CACAISO Jul 20102013
North Lancaster Solar (Fka Western Antelope DRY Ranch Addition)
Solar
20.0 MWOperating Los Angeles, CACAISO Mar 20112016
Silver State South Solar Project (Fka Silver State Solar II)
Solar
20.0 MWOperating Clark, NVCAISO Jul 20092016
Wildwood Solar I (Fka Goose Lake Solar I)
Solar
20.0 MWOperating Kern, CACAISO Oct 20102015
Kansas
Solar
20.0 MWOperating Kings, CACAISO Jul 20102014
Jacumba Solar Farm
Solar
20.0 MWOperating San Diego, CACAISO Aug 20102017
Corcoran PV Generation Facility
Solar
20.0 MWOperating Kings, CACAISO Feb 20092013
Lost Hills Solar
Solar
20.0 MWOperating San Francisco, CACAISO Jun 20092015
Vega Solar (Fka: FRV Vega Solar)
Solar
20.0 MWOperating Kings, CACAISO Jan 20102015
Kingbird Solar A (Fka Av Solar Ranch 2-A)
Solar
20.0 MWOperating Kern, CACAISO Mar 20112016
Sierra Solar GWX (Fka Silver Sun Greenworks)
Solar
20.0 MWOperating Los Angeles, CACAISO Dec 20102015
Atwell West PV Solar Generating Facility
Solar
20.0 MWOperating Tulare, CACAISO Apr 20092015
Central Antelope Solar (Fka Western Antelope Blue SKY Ranch B)
Solar
20.0 MWOperating Los Angeles, CACAISO Dec 20102016
Vista Energy Storage 2
Battery storage
20.0 MWOperating San Diego, CACAISO May 20162018
Kent South
Solar
20.0 MWOperating Kings, CACAISO Sep 20102014
Old River 1
Solar
20.0 MWOperating Kern, CACAISO Aug 20092014
Atwell Island PV Solar Generating Facility
Solar
20.0 MWOperating Tulare, CACAISO Apr 20082013
Burford Giffen
Solar
20.0 MWOperating Fresno, CACAISO Mar 20112017
Alpaugh North PV Solar Generating Facility
Solar
20.0 MWOperating Tulare, CACAISO Sep 20082013
Frontier Solar
Solar
20.0 MWOperating Kern, CACAISO Mar 20112019
West Antelope Solar (Fka: Ta - Acacia)
Solar
20.0 MWOperating Los Angeles, CACAISO Sep 20102014
Tracy - Additional Capacity
Gas
20.0 MWOperating San Joaquin, CACAISO Feb 20102012
Kingbird Solar B (Fka Av Solar Ranch 2-B
Solar
20.0 MWOperating Kern, CACAISO Mar 20112016
Maricopa West Solar PV (Fka Copus Solar One)
Solar
20.0 MWOperating Kern, CACAISO Apr 20102015
Orion Solar I (Fka: FRV Orion Kern Solar)
Solar
20.0 MWOperating Kern, CACAISO May 20102014
Summer Wheat Solar Farm
Solar
20.0 MWOperating Fresno, CACAISO Jun 20102018
Chowchilla Solar Project
Solar
20.0 MWOperating Madera, CACAISO Aug 20102015
Columbia Solar Energy 2 Fka Columbia Solar Energy II
Solar
20.0 MWOperating Contra Costa, CACAISO Mar 20112015
Whitney Point Solar
Solar
20.0 MWOperating Fresno, CACAISO Nov 20092017
Resava Energy Storage
Battery storage
20.0 MWOperating San Diego, CACAISO Apr 20192021
South Kern Solar PV Plant
Solar
20.0 MWOperating Kern, CACAISO Sep 20102015
Blackbriar
Battery storage
20.0 MWOperating Fresno, CACAISO Apr 20142023

Source: Rand, J. et al., Queued Up, Lawrence Berkeley National Laboratory, data through end of 2025. Compiled from the queues of the 7 ISO/RTOs and dozens of non-ISO utilities. A request is a proposal to connect, not a commitment to build: historically most are withdrawn. Capacity is the requested interconnection size; hybrids include the storage component. Transmission lines · Planned power plants (EIA)