GAS · CAISO

Aes Redondo Beach Unit 7

Aes Redondo Beach Unit 7 is a 26.0 MW gas request built and operating in the CAISO interconnection queue, in Los Angeles County, California, connecting to SCE.

Queue statusOperating
  1. PlanningQueued Aug 2007 (completed)
  2. Consented (completed)
  3. Construction (completed)
  4. OperatingFeb 2010 (current stage)
  5. Closed (not yet reached)

Request details

Queue ID
252
Grid region
CAISO (California)
Utility / transmission owner
SCE
Connection point (POI)
Redondo Beach Generating Station 220kV switchyard
Location
Los Angeles County, California
Technology
Gas: 26.0 MW
Total requested
26.0 MW
Study phase
Executed
Queue status
Operational
Entered queue
6 August 2007
Proposed online date
May 2007
Came online
February 2010

Location

Marker shows the centre of Los Angeles County; the queue data does not give exact sites.

Power plants in California · Transmission lines in California

Other requests in Los Angeles County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem