United States › Grid › Interconnection queues › California

GAS · CAISO

Palomar Energy Center 2

Palomar Energy Center 2 is a 35.0 MW gas request built and operating in the CAISO interconnection queue, in San Diego County, California, connecting to SDGE.

Queue statusOperating
  1. PlanningQueued Apr 2013 (completed)
  2. ConsentedSep 2015 (completed)
  3. Construction (completed)
  4. OperatingJul 2021 (current stage)
  5. Closed (not yet reached)

Request details

Queue ID
968
Grid region
CAISO (California)
Utility / transmission owner
SDGE
Connection point (POI)
Palomar Energy Switchyard 230 kV
Location
San Diego County, California
Technology
Gas: 35.0 MW
Total requested
35.0 MW
Service type
Network resource (NRIS)
Study phase
Executed
Queue status
Operational
Entered queue
30 April 2013
Agreement signed
15 September 2015
Proposed online date
March 2015
Came online
July 2021

Location

Marker shows the centre of San Diego County; the queue data does not give exact sites.

Power plants in California · Transmission lines in California

Other requests in San Diego County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem