United States › Grid › Interconnection queues
OCTARY USA · INTERCONNECTION QUEUESWithdrawn queue requests in the USA (2020 requests) — page 32
Before a new power plant or battery can connect to the US grid, it joins a queue for studies and an interconnection agreement. Most requests never get built. This shows every request: active, built and withdrawn.
Map
Requests
| Project | Capacity | Status |
|---|---|---|
| Stevensburg Road Solar Solar |
9.3 MW | Withdrawn / abandoned |
| Solar project TCS-51, Crook County Solar |
9.0 MW | Withdrawn / abandoned |
| Martins Creek Solar Solar |
8.8 MW | Withdrawn / abandoned |
| Lone Tree Wind Farm Onshore wind · Lone Tree Wind, LLC |
8.4 MW | Withdrawn / abandoned |
| Farnum Pike - NG WRI DG Area Study #2 >5 MW Solar |
8.0 MW | Withdrawn / abandoned |
| Eversource Group @ Falmouth 993 Solar + storage |
8.0 MW | Withdrawn / abandoned |
| Winter Drive Energy Storage Battery storage · JERA Americas Inc. |
8.0 MW | Withdrawn / abandoned |
| Solar project AG1-345, Nottoway County Solar |
8.0 MW | Withdrawn / abandoned |
| Empire Energy Storage Battery storage · JERA Americas Inc. |
8.0 MW | Withdrawn / abandoned |
| Solar project AG1-018, Washington County Solar |
8.0 MW | Withdrawn / abandoned |
| Shockoe Storage / Shockoe DP-Chatham 69 kV Battery storage · Zenith Solar, LLC |
8.0 MW | Withdrawn / abandoned |
| Heritage Storage Battery storage · Invenergy Storage Development LLC |
8.0 MW | Withdrawn / abandoned |
| Solar project AF2-236, Crawford County Solar |
8.0 MW | Withdrawn / abandoned |
| Solar project AF2-167, Monmouth County Solar |
8.0 MW | Withdrawn / abandoned |
| Lancaster BESS Battery storage · Saturn Energy Storage LLC |
8.0 MW | Withdrawn / abandoned |
| Wood River Substation - NG Western RI DG Area Study Solar |
7.8 MW | Withdrawn / abandoned |
| Solar project AG1-293, Crawford County Solar |
7.5 MW | Withdrawn / abandoned |
| Solar project AG1-246, Fayette County Solar |
7.5 MW | Withdrawn / abandoned |
| Solar project AG1-247, Bradford County Solar |
7.5 MW | Withdrawn / abandoned |
| Eversource Group @ Crystal Spring 646 Solar + storage |
7.5 MW | Withdrawn / abandoned |
| Solar project AG1-295, Indiana County Solar |
7.5 MW | Withdrawn / abandoned |
| Solar project AG1-294, Adams County Solar |
7.5 MW | Withdrawn / abandoned |
| Solar project AG1-396, Dauphin County Solar |
7.5 MW | Withdrawn / abandoned |
| Solar project AG1-157, Lehigh County Solar |
7.4 MW | Withdrawn / abandoned |
| Chase Hill - NG WRI DG Area Study #2 <5 MW Solar |
7.3 MW | Withdrawn / abandoned |
| Antis Solar Facility Solar |
7.3 MW | Withdrawn / abandoned |
| Solar project AF2-248, Wicomico County Solar |
7.2 MW | Withdrawn / abandoned |
| Delaware Road Solar Solar |
7.1 MW | Withdrawn / abandoned |
| Eversource Group @ Arsene St 654 Solar + storage |
7.0 MW | Withdrawn / abandoned |
| Mohansic BESS Battery storage · Saturn Energy Storage LLC |
7.0 MW | Withdrawn / abandoned |
| Battery storage project AG1-212, King George County Battery storage |
7.0 MW | Withdrawn / abandoned |
| Battery storage project AG1-209, Pittsylvania County Battery storage |
7.0 MW | Withdrawn / abandoned |
| Solar project AF2-240, Bradford County Solar |
7.0 MW | Withdrawn / abandoned |
| Arnolds Corner Energy Storage Battery storage · Arnold Corner Energy Storage 1 LLC |
7.0 MW | Withdrawn / abandoned |
| Warren Substation – NG RI-Warren-20-Comp-1 Study Solar |
6.9 MW | Withdrawn / abandoned |
| Tower Hill - NG Western RI DG Area Study Solar |
6.8 MW | Withdrawn / abandoned |
| Dutchess BESS Battery storage · Dimension NY 1 LLC |
6.6 MW | Withdrawn / abandoned |
| Solar project AG1-496, Hunterdon County Solar |
6.6 MW | Withdrawn / abandoned |
| Wood River - NG Western RI DG Area Study Solar |
6.5 MW | Withdrawn / abandoned |
| Other project 577, Ada County Other |
6.4 MW | Withdrawn / abandoned |
| Chase Hill Substation - NG Western RI DG Area Study Solar |
6.3 MW | Withdrawn / abandoned |
| Pawling Energy Storage Battery storage · JERA Americas Inc. |
6.0 MW | Withdrawn / abandoned |
| Modena Energy Storage I Battery storage · esVolta, LP |
6.0 MW | Withdrawn / abandoned |
| Kce NY 25 Battery storage · KCE NY 25, LLC |
6.0 MW | Withdrawn / abandoned |
| Solar project J1789, Monroe County Solar |
6.0 MW | Withdrawn / abandoned |
| Modena Energy Storage II Battery storage · esVolta, LP |
6.0 MW | Withdrawn / abandoned |
| Bristol BESS Battery storage · Saturn Energy Storage LLC |
6.0 MW | Withdrawn / abandoned |
| Solar Solar |
6.0 MW | Withdrawn / abandoned |
| Oblong Storage Battery storage · Invenergy Storage Development LLC |
6.0 MW | Withdrawn / abandoned |
| Pawling BESS Battery storage · Saturn Energy Storage LLC |
6.0 MW | Withdrawn / abandoned |
Capacity in the queue by state
Click a state to drill down.
By grid region
ISO/RTO markets and the non-ISO West and Southeast.
- PJM (Mid-Atlantic, Midwest)719 · 47.9 GW
- CAISO (California)107 · 46.6 GW
- West (non-ISO utilities)184 · 38.3 GW
- Southeast (non-ISO utilities)178 · 30.1 GW
- MISO (Midcontinent)195 · 27.2 GW
- NYISO (New York)129 · 25.5 GW
- SPP (Southwest Power Pool)60 · 10.4 GW
- ERCOT (Texas)67 · 10.4 GW
- ISO-NE (New England)113 · 9,841 MW
Requests by year joined
Capacity of requests in this view, by the year they entered the queue. Click a year.
Source: Rand, J. et al., Queued Up, Lawrence Berkeley National Laboratory, data through end of 2025. Compiled from the queues of the 7 ISO/RTOs and dozens of non-ISO utilities. A request is a proposal to connect, not a commitment to build: historically most are withdrawn. Capacity is the requested interconnection size; hybrids include the storage component. Transmission lines · Planned power plants (EIA)