United States › Grid › Interconnection queues › New York
BATTERY STORAGE · NYISOMohansic BESS
Mohansic BESS is a 7.0 MW battery storage request withdrawn in the NYISO interconnection queue, in Westchester County, New York, connecting to NYSEG.
Queue statusWithdrawn / abandoned
- PlanningQueued Jan 2020 (completed)
- Withdrawn / abandonedMar 2020 (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- 990
- Grid region
- NYISO (New York)
- Utility / transmission owner
- NYSEG
- Developer
- Saturn Energy Storage LLC
- Connection point (POI)
- The 13.2 kV 403 (1106340) line from Mohansic Substation running along Baldwin Rd
- Location
- Westchester County, New York
- Technology
- Battery: 7.0 MW
- Total requested
- 7.0 MW
- Queue status
- Withdrawn
- Entered queue
- 30 January 2020
- Withdrawn
- March 2020
Location
Marker shows the centre of Westchester County; the queue data does not give exact sites.
Other requests in Westchester County
- Indian Point 3 UprateNuclear · 38.0 MW · built
- Indian Point 3 UprateNuclear · 38.0 MW · built
- Indian Point 2 UprateNuclear · 36.0 MW · built
- Indian Point 2 UprateNuclear · 36.0 MW · built
- VerplanckBattery storage · 1,000 MW · withdrawn
- Sprain Brook Energy StorageBattery storage · 500 MW · withdrawn
- Buchanan Point BESS IIBattery storage · 500 MW · withdrawn
- Buchanan Energy Storage-SouthBattery storage · 500 MW · withdrawn
- Buchanan Energy Storage - NorthBattery storage · 500 MW · withdrawn
- Millwood Energy StorageBattery storage · 500 MW · withdrawn
- Eastview Energy Storage ProjectBattery storage · 400 MW · withdrawn
- Indian Point Energy CenterGas · 400 MW · withdrawn
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem