United States › Grid › Interconnection queues › New York
BATTERY STORAGE · NYISOPawling Energy Storage
Pawling Energy Storage is a 6.0 MW battery storage request withdrawn in the NYISO interconnection queue, in Putnam County, New York, connecting to NYSEG.
Queue statusWithdrawn / abandoned
- PlanningQueued Jan 2020 (completed)
- Withdrawn / abandonedMay 2020 (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- 986
- Grid region
- NYISO (New York)
- Utility / transmission owner
- NYSEG
- Developer
- JERA Americas Inc.
- Connection point (POI)
- 46kV line
- Location
- Putnam County, New York
- Technology
- Battery: 6.0 MW
- Total requested
- 6.0 MW
- Queue status
- Withdrawn
- Entered queue
- 29 January 2020
- Withdrawn
- May 2020
Location
Marker shows the centre of Putnam County; the queue data does not give exact sites.
Other requests in Putnam County
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem