United States βΊ Grid βΊ Interconnection queues βΊ New York
SOLAR Β· NYISOBrewster Solar
Brewster Solar is a 25.0 MW solar request withdrawn in the NYISO interconnection queue, in Putnam County, New York, connecting to NYSEG.
Queue statusWithdrawn / abandoned
- PlanningQueued Jun 2018 (completed)
- Withdrawn / abandonedNov 2018 (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- 724
- Grid region
- NYISO (New York)
- Utility / transmission owner
- NYSEG
- Developer
- Brewster Solar, LLC
- Connection point (POI)
- Pawling - Croton Falls 115kV
- Location
- Putnam County, New York
- Technology
- Solar: 25.0 MW
- Total requested
- 25.0 MW
- Queue status
- Withdrawn
- Entered queue
- 8 June 2018
- Withdrawn
- November 2018
Location
Marker shows the centre of Putnam County; the queue data does not give exact sites.
Other requests in Putnam County
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem