United States β€Ί Grid β€Ί Interconnection queues β€Ί New York

BATTERY STORAGE Β· NYISO

Pawling BESS

Pawling BESS is a 6.0 MW battery storage request withdrawn in the NYISO interconnection queue, in Dutchess County, New York, connecting to NYSEG.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Jan 2020 (completed)
  2. Withdrawn / abandonedJul 2020 (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
989
Grid region
NYISO (New York)
Utility / transmission owner
NYSEG
Developer
Saturn Energy Storage LLC
Connection point (POI)
Pawling-Corbin Rd 46 kV
Location
Dutchess County, New York
Technology
Battery: 6.0 MW
Total requested
6.0 MW
Queue status
Withdrawn
Entered queue
30 January 2020
Withdrawn
July 2020

Location

Marker shows the centre of Dutchess County; the queue data does not give exact sites.

Power plants in New York Β· Transmission lines in New York

Other requests in Dutchess County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem