United States βΊ Grid βΊ Interconnection queues βΊ New York
BATTERY STORAGE Β· NYISOPawling BESS
Pawling BESS is a 6.0 MW battery storage request withdrawn in the NYISO interconnection queue, in Dutchess County, New York, connecting to NYSEG.
Queue statusWithdrawn / abandoned
- PlanningQueued Jan 2020 (completed)
- Withdrawn / abandonedJul 2020 (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- 989
- Grid region
- NYISO (New York)
- Utility / transmission owner
- NYSEG
- Developer
- Saturn Energy Storage LLC
- Connection point (POI)
- Pawling-Corbin Rd 46 kV
- Location
- Dutchess County, New York
- Technology
- Battery: 6.0 MW
- Total requested
- 6.0 MW
- Queue status
- Withdrawn
- Entered queue
- 30 January 2020
- Withdrawn
- July 2020
Location
Marker shows the centre of Dutchess County; the queue data does not give exact sites.
Other requests in Dutchess County
- East FishkillBattery storage Β· 205 MW Β· in study
- Highbush Energy StorageBattery storage Β· 200 MW Β· in study
- Overlook StorageBattery storage Β· 199 MW Β· in study
- Aria Storage 2Battery storage Β· 150 MW Β· in study
- Aria Storage 1Battery storage Β· 100 MW Β· in study
- Cricket Valley Energy Center IIGas Β· 1,132 MW Β· built
- Cricket Valley Energy Center IIGas Β· 1,132 MW Β· built
- Cricket Valley Project (QP444 in NYISO Queue)Gas Β· 1,020 MW Β· built
- Cricket Valley Energy CenterGas Β· 1,136 MW Β· withdrawn
- Dover NY BESSBattery storage Β· 1,000 MW Β· withdrawn
- Dover NY BESS (NYISO-C24-316)Battery storage Β· 1,000 MW Β· withdrawn
- Wingdale Energy CenterGas Β· 650 MW Β· withdrawn
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem