United States › Grid › Interconnection queues › Virginia
BATTERY STORAGE · PJMShockoe Storage / Shockoe DP-Chatham 69 kV
Shockoe Storage / Shockoe DP-Chatham 69 kV is a 8.0 MW battery storage request withdrawn in the PJM interconnection queue, in Fluvanna County, Virginia, connecting to Dominion.
Queue statusWithdrawn / abandoned
- PlanningQueued Mar 2020 (completed)
- Withdrawn / abandonedJan 2025 (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- AF2-403
- Grid region
- PJM (Mid-Atlantic, Midwest)
- Utility / transmission owner
- Dominion
- Developer
- Zenith Solar, LLC
- Connection point (POI)
- Shockoe DP-Chatham 69 kV
- Location
- Fluvanna County, Virginia
- Technology
- Battery: 8.0 MW
- Total requested
- 8.0 MW
- Service type
- Network resource (NRIS)
- Study phase
- Available studies: Feasibility Study, System Impact Study
- Queue status
- Withdrawn
- Entered queue
- 31 March 2020
- Proposed online date
- December 2022
- Withdrawn
- January 2025
Location
Marker shows the centre of Fluvanna County; the queue data does not give exact sites.
Other requests in Fluvanna County
- Gas project AH1-712, Fluvanna CountyGas · 776 MW · in study
- Gas project AH1-723, Fluvanna CountyGas · 776 MW · in study
- Battery storage project AI2-005, Fluvanna CountyBattery storage · 100 MW · in study
- Gas project AB1-181, Fluvanna CountyGas · 37.3 MW · built
- Solar project AH1-018, Fluvanna CountySolar · 149 MW · withdrawn
- Solar project AH1-019, Fluvanna CountySolar · 149 MW · withdrawn
- Solar + storage project AF2-397, Fluvanna CountySolar + storage · 130 MW · withdrawn
- Solar + storage project AF1-293, Fluvanna CountySolar + storage · 128 MW · withdrawn
- Solar project AG2-521, Fluvanna CountySolar · 85.0 MW · withdrawn
- Solar project AG2-259, Fluvanna CountySolar · 80.0 MW · withdrawn
- Solar project AD2-173, Fluvanna CountySolar · 75.0 MW · withdrawn
- Solar project AG1-284, Fluvanna CountySolar · 70.0 MW · withdrawn
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem