United States › Grid › Interconnection queues › Virginia
BATTERY STORAGE · PJMBattery storage project AI2-005, Fluvanna County
Battery storage project AI2-005, Fluvanna County is a 100 MW battery storage request in interconnection study in the PJM interconnection queue, in Fluvanna County, Virginia, connecting to Dominion.
Queue statusIn planning
- PlanningQueued Oct 2022 (current stage)
- Consented (not yet reached)
- Construction (not yet reached)
- OperatingTarget May 2028 (not yet reached)
- Closed (not yet reached)
Studies assess what grid upgrades the project would need and who pays for them. A signed interconnection agreement is the main step before construction.
Request details
- Queue ID
- AI2-005
- Grid region
- PJM (Mid-Atlantic, Midwest)
- Utility / transmission owner
- Dominion
- Connection point (POI)
- Bremo 115 kV
- Location
- Fluvanna County, Virginia
- Technology
- Battery: 100 MW
- Total requested
- 100 MW
- Service type
- Network resource (NRIS)
- Study phase
- Feasibility Study
- Queue status
- Active
- Entered queue
- 24 October 2022
- Proposed online date
- May 2028
Location
Marker shows the centre of Fluvanna County; the queue data does not give exact sites.
Other requests in Fluvanna County
- Gas project AH1-712, Fluvanna CountyGas · 776 MW · in study
- Gas project AH1-723, Fluvanna CountyGas · 776 MW · in study
- Gas project AB1-181, Fluvanna CountyGas · 37.3 MW · built
- Solar project AH1-018, Fluvanna CountySolar · 149 MW · withdrawn
- Solar project AH1-019, Fluvanna CountySolar · 149 MW · withdrawn
- Solar + storage project AF2-397, Fluvanna CountySolar + storage · 130 MW · withdrawn
- Solar + storage project AF1-293, Fluvanna CountySolar + storage · 128 MW · withdrawn
- Solar project AG2-521, Fluvanna CountySolar · 85.0 MW · withdrawn
- Solar project AG2-259, Fluvanna CountySolar · 80.0 MW · withdrawn
- Solar project AD2-173, Fluvanna CountySolar · 75.0 MW · withdrawn
- Solar project AG1-284, Fluvanna CountySolar · 70.0 MW · withdrawn
- Solar project AH1-375, Fluvanna CountySolar · 60.0 MW · withdrawn
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem