United States βΊ Grid βΊ Interconnection queues βΊ Virginia
SOLAR Β· PJMSolar project AG2-259, Fluvanna County
Solar project AG2-259, Fluvanna County is a 80.0 MW solar request withdrawn in the PJM interconnection queue, in Fluvanna County, Virginia, connecting to Dominion.
Queue statusWithdrawn / abandoned
- PlanningQueued Mar 2021 (completed)
- Withdrawn / abandonedDec 2024 (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- AG2-259
- Grid region
- PJM (Mid-Atlantic, Midwest)
- Utility / transmission owner
- Dominion
- Connection point (POI)
- Sherwood - Kidds Store 115 kV
- Location
- Fluvanna County, Virginia
- Technology
- Solar: 80.0 MW
- Total requested
- 80.0 MW
- Service type
- Network resource (NRIS)
- Study phase
- Feasibility Study
- Queue status
- Withdrawn
- Entered queue
- 19 March 2021
- Proposed online date
- March 2024
- Withdrawn
- December 2024
Location
Marker shows the centre of Fluvanna County; the queue data does not give exact sites.
Other requests in Fluvanna County
- Gas project AH1-712, Fluvanna CountyGas Β· 776 MW Β· in study
- Gas project AH1-723, Fluvanna CountyGas Β· 776 MW Β· in study
- Battery storage project AI2-005, Fluvanna CountyBattery storage Β· 100 MW Β· in study
- Gas project AB1-181, Fluvanna CountyGas Β· 37.3 MW Β· built
- Solar project AH1-018, Fluvanna CountySolar Β· 149 MW Β· withdrawn
- Solar project AH1-019, Fluvanna CountySolar Β· 149 MW Β· withdrawn
- Solar + storage project AF2-397, Fluvanna CountySolar + storage Β· 130 MW Β· withdrawn
- Solar + storage project AF1-293, Fluvanna CountySolar + storage Β· 128 MW Β· withdrawn
- Solar project AG2-521, Fluvanna CountySolar Β· 85.0 MW Β· withdrawn
- Solar project AD2-173, Fluvanna CountySolar Β· 75.0 MW Β· withdrawn
- Solar project AG1-284, Fluvanna CountySolar Β· 70.0 MW Β· withdrawn
- Solar project AH1-375, Fluvanna CountySolar Β· 60.0 MW Β· withdrawn
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem