United States › Grid › Interconnection queues › Pennsylvania
SOLAR · PJMMartins Creek Solar
Martins Creek Solar is a 8.8 MW solar request withdrawn in the PJM interconnection queue, in Northampton County, Pennsylvania, connecting to PPL.
Queue statusWithdrawn / abandoned
- PlanningQueued Sep 2020 (completed)
- Withdrawn / abandonedMay 2024 (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- AG1-498
- Grid region
- PJM (Mid-Atlantic, Midwest)
- Utility / transmission owner
- PPL
- Connection point (POI)
- Mount Bethel 12.47 kV
- Location
- Northampton County, Pennsylvania
- Technology
- Solar: 8.8 MW
- Total requested
- 8.8 MW
- Service type
- Network resource (NRIS)
- Study phase
- Available studies: Feasibility Study, System Impact Study; Interim/Interconnection Service Agreement: Wholesale Market P
- Queue status
- Withdrawn
- Entered queue
- 30 September 2020
- Proposed online date
- April 2025
- Withdrawn
- May 2024
Location
Marker shows the centre of Northampton County; the queue data does not give exact sites.
Power plants in Pennsylvania · Transmission lines in Pennsylvania
Other requests in Northampton County
- Solar + storage project AI1-152, Northampton CountySolar + storage · 19.9 MW · in study
- BethlehemGas · 750 MW · built
- Lower Mt BethelGas · 600 MW · built
- Conectiv Bethlem CT 6, ST2Gas · 350 MW · built
- Lower Mount BethelGas · 86.6 MW · built
- Bethlehem Gen Facility Units 1 - 8Gas · 42.0 MW · built
- Lower Mount BethelGas · 33.0 MW · built
- Martins Creek #3Coal · 30.0 MW · built
- Martins Creek #4Coal · 30.0 MW · built
- Grand Central Sanitary LFOther · 10.0 MW · built
- Portland Station Unit 5Gas · 6.5 MW · built
- Bethlehem LFOther · 5.0 MW · built
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem