United States βΊ Grid βΊ Interconnection queues βΊ Pennsylvania
GAS Β· PJMBethlehem
Bethlehem is a 750 MW gas request built and operating in the PJM interconnection queue, in Northampton County, Pennsylvania, connecting to PPL.
Request details
- Queue ID
- B03
- Grid region
- PJM (Mid-Atlantic, Midwest)
- Utility / transmission owner
- PPL
- Connection point (POI)
- Hosensack 500kV
- Location
- Northampton County, Pennsylvania
- Technology
- Gas: 750 MW
- Total requested
- 750 MW
- Service type
- Network resource (NRIS)
- Study phase
- Available studies: Feasibility Study, System Impact Study, Facilities Study; Interim/Interconnection Service Agreement:
- Queue status
- Operational
- Entered queue
- 30 April 1999
- Proposed online date
- January 2003
- Came online
- January 2003
Location
Marker shows the centre of Northampton County; the queue data does not give exact sites.
Power plants in Pennsylvania Β· Transmission lines in Pennsylvania
Other requests in Northampton County
- Solar + storage project AI1-152, Northampton CountySolar + storage Β· 19.9 MW Β· in study
- Lower Mt BethelGas Β· 600 MW Β· built
- Conectiv Bethlem CT 6, ST2Gas Β· 350 MW Β· built
- Lower Mount BethelGas Β· 86.6 MW Β· built
- Bethlehem Gen Facility Units 1 - 8Gas Β· 42.0 MW Β· built
- Lower Mount BethelGas Β· 33.0 MW Β· built
- Martins Creek #3Coal Β· 30.0 MW Β· built
- Martins Creek #4Coal Β· 30.0 MW Β· built
- Grand Central Sanitary LFOther Β· 10.0 MW Β· built
- Portland Station Unit 5Gas Β· 6.5 MW Β· built
- Bethlehem LFOther Β· 5.0 MW Β· built
- Bethlehem LandfillOther Β· 5.0 MW Β· built
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem