United States β€Ί Grid β€Ί Interconnection queues β€Ί New York

BATTERY STORAGE Β· NYISO

Heritage Storage

Heritage Storage is a 8.0 MW battery storage request withdrawn in the NYISO interconnection queue, in Erie County, New York, connecting to NYSEG.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Jan 2020 (completed)
  2. Withdrawn / abandonedAug 2020 (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
980
Grid region
NYISO (New York)
Utility / transmission owner
NYSEG
Developer
Invenergy Storage Development LLC
Connection point (POI)
Erie 34.5kV Substation
Location
Erie County, New York
Technology
Battery: 8.0 MW
Total requested
8.0 MW
Queue status
Withdrawn
Entered queue
22 January 2020
Withdrawn
August 2020

Location

Marker shows the centre of Erie County; the queue data does not give exact sites.

Power plants in New York Β· Transmission lines in New York

Other requests in Erie County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem