United States › Grid › Interconnection queues › Virginia

BATTERY STORAGE · PJM

Arnolds Corner Energy Storage

Arnolds Corner Energy Storage is a 7.0 MW battery storage request withdrawn in the PJM interconnection queue, in King George County, Virginia, connecting to Dominion.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Oct 2020 (completed)
  2. Withdrawn / abandonedJul 2025 (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
AG2-020
Grid region
PJM (Mid-Atlantic, Midwest)
Utility / transmission owner
Dominion
Developer
Arnold Corner Energy Storage 1 LLC
Connection point (POI)
Arnolds Corner 34.5 kV
Location
King George County, Virginia
Technology
Battery: 7.0 MW
Total requested
7.0 MW
Service type
Network resource (NRIS)
Study phase
In Progress (unknown study)
Queue status
Withdrawn
Entered queue
23 October 2020
Proposed online date
December 2022
Withdrawn
July 2025

Location

Marker shows the centre of King George County; the queue data does not give exact sites.

Power plants in Virginia · Transmission lines in Virginia

Other requests in King George County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem