Arnolds Corner Energy Storage is a 7.0 MW battery storage request withdrawn in the PJM interconnection queue, in King George County, Virginia, connecting to Dominion.
Queue statusWithdrawn / abandoned
- PlanningQueued Oct 2020 (completed)
- Withdrawn / abandonedJul 2025 (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- AG2-020
- Grid region
- PJM (Mid-Atlantic, Midwest)
- Utility / transmission owner
- Dominion
- Developer
- Arnold Corner Energy Storage 1 LLC
- Connection point (POI)
- Arnolds Corner 34.5 kV
- Location
- King George County, Virginia
- Technology
- Battery: 7.0 MW
- Total requested
- 7.0 MW
- Service type
- Network resource (NRIS)
- Study phase
- In Progress (unknown study)
- Queue status
- Withdrawn
- Entered queue
- 23 October 2020
- Proposed online date
- December 2022
- Withdrawn
- July 2025
Location
Marker shows the centre of King George County; the queue data does not give exact sites.
Other requests in King George County
- Gibson Solar ISolar · 100 MW · agreement signed
- Harwood PowerBattery storage · 100 MW · agreement signed
- Gibson Solar ISolar · 34.0 MW · agreement signed
- Battery storage project AI2-456, King George CountyBattery storage · 150 MW · in study
- Battery storage project AH2-144, King George CountyBattery storage · 150 MW · in study
- Battery storage project AH2-145, King George CountyBattery storage · 52.3 MW · in study
- King George Renewable Energy FacilityOther · 9.8 MW · built
- Gas project T149, King George CountyGas · 580 MW · withdrawn
- Battery storage project AG1-019, King George CountyBattery storage · 100 MW · withdrawn
- Battery storage project AG2-303, King George CountyBattery storage · 100 MW · withdrawn
- Solar project AG2-199, King George CountySolar · 55.0 MW · withdrawn
- Solar project AB2-072, King George CountySolar · 18.0 MW · withdrawn
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem