SOLAR Β· PJMSolar project AB2-072, King George County
Solar project AB2-072, King George County is a 18.0 MW solar request withdrawn in the PJM interconnection queue, in King George County, Virginia, connecting to Dominion.
Queue statusWithdrawn / abandoned
- PlanningQueued Mar 2016 (completed)
- Withdrawn / abandonedJan 2019 (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- AB2-072
- Grid region
- PJM (Mid-Atlantic, Midwest)
- Utility / transmission owner
- Dominion
- Connection point (POI)
- Arnold's Corner 34.5kV
- Location
- King George County, Virginia
- Technology
- Solar: 18.0 MW
- Total requested
- 18.0 MW
- Service type
- Network resource (NRIS)
- Study phase
- Available studies: Feasibility Study, System Impact Study; Interim/Interconnection Service Agreement: Withdrawn
- Queue status
- Withdrawn
- Entered queue
- 31 March 2016
- Proposed online date
- September 2017
- Withdrawn
- January 2019
Location
Marker shows the centre of King George County; the queue data does not give exact sites.
Other requests in King George County
- Gibson Solar ISolar Β· 100 MW Β· agreement signed
- Harwood PowerBattery storage Β· 100 MW Β· agreement signed
- Gibson Solar ISolar Β· 34.0 MW Β· agreement signed
- Battery storage project AI2-456, King George CountyBattery storage Β· 150 MW Β· in study
- Battery storage project AH2-144, King George CountyBattery storage Β· 150 MW Β· in study
- Battery storage project AH2-145, King George CountyBattery storage Β· 52.3 MW Β· in study
- King George Renewable Energy FacilityOther Β· 9.8 MW Β· built
- Gas project T149, King George CountyGas Β· 580 MW Β· withdrawn
- Battery storage project AG1-019, King George CountyBattery storage Β· 100 MW Β· withdrawn
- Battery storage project AG2-303, King George CountyBattery storage Β· 100 MW Β· withdrawn
- Solar project AG2-199, King George CountySolar Β· 55.0 MW Β· withdrawn
- Battery storage project AG1-212, King George CountyBattery storage Β· 7.0 MW Β· withdrawn
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem